Here comes the full version analysis of four typical electric shock accidents! Attached preventive measures for electric shock accident in

in Luyang District, Hefei city at about 22:00 on August 16, 2020, when the operators of Anhui building materials Co., Ltd.

(4) The safety supervision of the competent departments of the industry is insufficient.

After the accident, on June 23, 2021, Che assigned workers Li, Zhou, Tang and Liu to the business area on the first floor of Henggang Zhijian Times Square to carry out wall drilling, ceiling opening and wiring.

Direct cause: when working in the ceiling, Zhou accidentally touched the bare copper core of the lighting power line with his hands, and his body parts touched the nearby metal objects to form a circuit for electric shock.

2 “6.24” electric shock accident of a business management company in yemoshang village, Shenzhen on June 24, 2021, an electric shock accident occurred at Zhijian Times Square, No.

During the hoisting process, the cantilever of the street lamp pole touched with phase C of the 10kV overhead power line, and Kuang, who was holding the street lamp pole to adjust the landing point, was electrocuted and fell to the ground.

Kuang, have weak safety awareness and illegally enter the power overhead line protection zone for operation; Failing to use special lifting machinery such as cranes according to the requirements of the construction organization design (scheme), and illegally using excavators to lift lamp poles; During operation, workers did not wear insulating gloves, insulating shoes and other labor protection articles with corresponding voltage levels, resulting in failure to obtain effective safety protection in case of electric shock.

At about 15:08, su * * hooked the access hole with an iron hook at about 0.9m from the bottom of the lamp pole, and fixed it with a safety belt at about 1.5m from the top of the lamp pole.

(3) After a commercial management Co., Ltd.

in yemoshang village, Shenzhen signed for the notice of suspension of sporadic projects issued by Henggang street, it failed to timely notify the vehicle * * to stop work, and failed to uniformly coordinate and manage the safety production of the construction contractor.

3 “8.16” electric shock accident of Anhui building materials Co., Ltd.

(4) Cheyoulong construction team does not have the conditions for safe production and has not obtained the construction qualification to undertake the project organization construction.

At about 15:10 on August 28, 2021, an electric shock death accident occurred at the lighting pole hoisting construction site near g355 National Highway in East rushe, Guancun village, Wenquan Town, Conghua, Guangzhou.

The death toll caused by the five major injuries accounts for more than 90% of the total accident deaths in the construction industry.

A telephone ring rang from the ceiling.

At 8:00 on June 24, workers Li * *, Zhou * *, Tang * * and Liu * * arrived at the decoration site of the business area on the 1st floor of Zhijian Times Square in Henggang for construction.

Indirect reasons (1) a business management Co., Ltd.

Direct cause (1) the safety distance between the lamp pole of the incident project and the sideline of the 10kV overhead line did not meet the requirements, and the center of gravity of the street lamp pole shifted during the hoisting process, resulting in the simultaneous discharge of the 10kV High voltage through the steel pipe beside the installation support seat of the street lamp pole and the human body.

One person died and the direct economic loss was about RMB 2.05 million.

in yemoshang village, Shenzhen has not signed the construction contract and the safety production management agreement with Che Youlong to stipulate their respective safety production management responsibilities.

1, Maosheng Road, Zhisheng community, Henggang street, Longgang District, resulting in one death.

Electric shock accident refers to the accident in which the current flows through the human body or the arc burns, causing physiological injury and derived injury, generally manifested as electric burn, falling after electric shock, lightning injury, etc.

At 12:14, 120, Zhou was declared invalid and died.

Thread Swivel Eye

(2) The supervision unit did not strictly perform the supervision responsibilities.

The five major injuries in construction refer to falling from height, object strike, mechanical injury, electric shock and collapse.

in yemoshang village, Shenzhen illegally contracted out the secondary construction, renovation and decoration project to individuals who did not have the conditions for safe production and corresponding qualifications.

(2) The on-site operators, such as Mr.

(2) The safety management responsibilities are not clear.

The on-site personnel lifted the exposed copper wires with rubber hoses, lifted Zhou from the ceiling to the ground, and dialed 120 emergency telephone at the same time.

In violation of the construction requirements, the lamp pole is hoisted with a non special lifting machine hook, and the construction is organized in violation of the regulations.

(5) The vehicle * * did not organize the operators to carry out safety education and training, and the operators did not have the necessary safety production knowledge and safe operation skills.

(3) Suguanhua, the construction organizer, did not organize the construction in strict accordance with the requirements of the construction organization design (scheme), which caused the operators to enter the 10kV overhead power line protection zone in violation of regulations for street lamp hoisting.

After the accident, at about 14:00 on August 28, 2021, su * * organized five people, including the excavator driver Guan * *, the rigger su * *, the traffic commander su * *, the pole worker Guan * * and Kuang, to carry out the construction of street lamp poles for the rural street lamp construction project in Conghua District in the section beside the g355 National Highway in dongrushe, Wenquan Town, Conghua district.

(6) Car * * has weak safety awareness, there are many metal pipes and wires in the ceiling, and comprehensive risk identification and hidden danger troubleshooting are not carried out in the operation area before operation.

Tang * * and Li * * climbed to the ceiling through a herringbone ladder and found Zhou lying on the ceiling with a bare copper wire between his legs.

120 after arriving at the scene, Zhou was rescued immediately.

in Luyang District, Hefei City, Anhui Province removed the fences in the construction site of the first section of the Second Ring Road project of Hefei City, an electric shock accident occurred, resulting in two deaths..

At 11:40, Li * * telephoned Zhou to have lunch after work.

The bottom of the lamp pole touched the iron pole next to it, which was used to bind the solar umbrella.

Accident indirect (1) the construction unit fails to implement the main responsibility for safety production.

The following is a brief review of several typical electric shock accidents at the construction site: 1 “8.28” electric shock accident of a water conservancy construction Co., Ltd.

in Guangzhou.

A commercial management Co., Ltd.

Then the hook machine hooks the safety belt and slowly pulls it up.

(3) The project management unit did not strictly perform its safety management responsibilities.

Guan Haitao holds the bottom of the lamp pole, and Kuang holds the pole body about 2 meters away from the bottom of the lamp pole with both hands, ready to align with the vertical pole.