How to write the tooling construction contract?

Article 4 obligations of the employer 1.

Article V obligations of the contractor 1.

Contract cost: the project cost of the contract is: (in words) yuan.

2.

Handle the relevant formalities of application for registration and property management and bear the expenses, including the certificates and expenses for the Contractor’s construction personnel to enter the construction site.

Both parties shall negotiate on the occurrence and expenses of the act of purchasing on behalf of others.

If it is necessary to dismantle or modify the non load-bearing structure or equipment pipeline of the original building, it is responsible to go through the corresponding approval procedures with the relevant departments and bear the corresponding expenses.

4.

The design fee (in words) yuan shall be paid by the employer (this fee is not included in the project price).

9.

During the construction, the safe construction operation specifications, fire prevention regulations, construction specifications and quality standards shall be strictly implemented, and each stage of the project shall be completed on schedule with good quality (attached table).

6.

5.

The opinions of other members of the employer on the project and the Contractor shall be contacted with the Contractor through the employer’s representative; Be responsible for material mobilization and completion acceptance.

Coordinate the relationship between the construction team and the neighborhood to ensure the construction time of the contractor.

10.

The contract text shall not be disassembled, added or deleted.

Project location:___________________________________________________ 2.

The employer’s representative shall supervise and inspect the project quality and progress, and regularly handle the acceptance, change and registration procedures.

Project contents and practices (see Annex).

Straight Anchor

The employer shall create conditions for the contractor to enter the site for construction before commencement.

Coordinate with relevant departments to do a good job in site security, fire protection, garbage disposal, etc., and bear the corresponding costs.

3.

Obey the management and supervision of government departments and industry competent departments..

The Contractor’s operational, publicity and knowledge-based materials shall not be used as annexes to the contract.

Strictly implement the national regulations on construction site management, and do not disturb the residents or pollute the environment.

Article 3 construction drawings both parties agree that the construction drawings shall be provided in the following way: (1) the employer shall design and provide the construction drawings in duplicate, one for both the employer and the contractor.

Cooperate with the management and supervision of government departments and industry competent departments.

If the employer still needs to use part of the house during the construction period, it shall be responsible for the security and fire protection of the construction site.

Protect the articles and furnishings in the original room and ensure the smoothness of the water supply and drainage pipes.

Appoint the employer’s resident representative to be responsible for the performance of the contract; 2.

If losses are caused, compensation shall be made according to the price.

If it is necessary to add clauses, they can be supplemented separately.

It is not allowed to dismantle the indoor load-bearing structure.

(1) The Contractor shall contract labor and materials; (2) The Contractor shall contract labor and some materials, and the employer shall provide some materials; (3) The contractor undertakes labor and the employer supplies materials; 4.

4.

Before the completion of the project is handed over to the employer, it shall be responsible for protecting all facilities and project finished products on the site.

The project duration is days, the commencement date is mm / DD / yyyy, and the completion date is mm / yyyy.

3.

(2) The employer entrusts the contractor to design the construction drawings in duplicate, one for both the employer and the contractor (see the annex).

Article 1 project overview 1.

7.

Article 2 project supervision if the project is subject to project supervision, the employer and the supervision company shall sign a separate project supervision contract, and notify the contractor of the name, unit, contact information and responsibilities of the supervision engineer.

For the project contracting mode, both parties agree to adopt the following contracting mode.

5.

The employer’s address and contact number of the decoration project construction contract the Contractor’s address and contact number shall be in accordance with the contract law of the people’s Republic of China and other relevant laws and regulations, and in combination with the characteristics of the construction of building decoration projects, On the basis of equality, voluntariness and consensus through consultation, Party A and Party B hereby sign this contract on matters related to the decoration project, which shall be observed by both parties.

Appoint the Contractor’s resident representative to be responsible for the performance of the contract.

The copy of the contract is invalid.

Ensure the cleanness of the construction site, and clean the construction site after the completion of the project; 6.

3.

Click the blue word to pay attention to us in case of need ~ contract No.: Decoration Engineering Construction Contract employer:_____________________________________________________________ Contractor: project address:____________________________________________________________ Project cost:____________________________________________________________ It is stated that the font filled in the contract must be consistent and shall not be altered.

The water source and power supply during the construction period shall be provided free of charge for the use of the contractor.

The annexes to the contract shall come into force after being jointly signed by the employer and the contractor.

Including: removal of indoor articles, furnishings or stacking and covering of indoor articles that are not easy to move, in the principle of not affecting the construction.