Query relevant equipment information on the network management system.
After the completion of business production, the test shall be carried out on site, and the bandwidth shall meet the standard without delay or packet loss.
The self maintenance personnel of the network department carry out on-site construction.
Specific steps and processes: 1.
The initiation and construction process of such projects is long and the construction cost is high, but the overall construction is not difficult.
Independent receipt on the business arrangement system.
3.
It is applicable to cities with a large number of dedicated lines, and the effect of cost reduction and efficiency increase is remarkable.
It is expected to complete 300 independent construction projects this year.
After the design and construction teams are established by their own personnel, the special lines for simple scenes are opened independently, and the cost of a single special line is reduced to about 1000 yuan.
Technical backbones of China Railcom corporation are regularly invited to our company for technical lectures and exchanges, to learn their excellent technology and construction experience, and to improve the speed of special line opening and fault handling capacity.
This link shall be completed by the surveyor himself.
The third place in the province in terms of self loading probability.
2、 The implementation plan consists of a rapid survey team composed of professionals from the network department, and a simple construction plan is prepared at the same time.
2.
1、 Project background at present, the newly opened special lines are mainly old customers, and most of them have used our special lines.
4、 Work plan for the next step 1.
Accelerate the construction of Passenger Dedicated Lines in 2022 and complete the optimization of the whole process of independent construction…
5.
Based on the average cost of 1000 yuan / piece of installed quick opening, a total of more than 287000 yuan of installation cost was saved.
There is no need for design by the design institute.
4.
After the joint review of the scheme, 2 self maintenance personnel shall be organized to carry out on-site construction and 1 person to make data.
Go to the site to check the resource satisfaction.
2.
3、 Experience summary since the implementation of the special line project in 2020, our company has completed the quick opening of 287 special lines in total.
It can be surveyed, designed and constructed by its own personnel, which can effectively shorten the opening time and save the construction cost, design cost and other engineering investment.
Calculate the required materials and prepare the construction scheme.
After the design is completed, it will be handed over to the on-site construction personnel and data production personnel.
Continue to promote the installation type opening work, expand the independent construction of more scenes, and save more installation and relocation costs.