Teach you how to write a carpentry construction contract

4.

Due to the loose sealing of the external wall, there is slurry flow, which shall be washed during concrete pouring.

Quality requirements: 1.1 Party B must carry out construction in accordance with the design drawings and the current national specifications, and the unit price shall be reduced by 10% if it fails to meet the requirements.

Party A shall be responsible for providing large-scale tools and revolving materials.

After the pipe erection and jacking are removed, they shall be transported to the designated place and stacked neatly; 3.

In case of rework, in addition to deducting the material cost, corresponding punishment shall be given according to the reward and punishment regulations of Hebei Construction Group.

Tower crane command required by the construction team.

Financial requirements: the construction team is required to provide legal procedures such as attendance and employee payroll.

Party A will punish Party A for unreasonably delaying the construction period.

Pile the formwork and timbers to the place designated by Party A, and clean the attached objects and nails; 7.

Materials shall not be wasted at will.

2.4 Party B must strictly abide by the rules and regulations, obey the management of the safety personnel of the project department, and be severely punished if it fails to correct after repeated education.

Party B shall bear the chiseling expenses arising from the concrete formwork expansion and compensate for certain material expenses (Party B shall deal with such phenomena as formwork running, formwork expansion, uneven joints between formworks and uneven internal and external corners caused by Party B.

Requirements for civilized construction on site: Party B shall ensure that the construction site reaches the provincial civilized construction site.

The cost includes wind and snow shutdown, water and power supply interruption, mechanical repair shutdown and sporadic labor during the construction period.

Fasteners, hooks, fishing head bolts, retaining bowls (through wall bolts, step-by-step tightening), etc.

In case of any cleaning cost, it shall be deducted from the team task list, and a fine of 500-1000 yuan shall be imposed according to the on-site punishment provisions..

Party A shall be responsible for providing the canteen, and Party B shall bear the food and accommodation expenses.

2.2 special types of work must be employed with certificates, and legal employment procedures must be handled as required, and the expenses shall be borne by Party B.

Party A shall arrive at the site on time in combination with the material demand plan provided by Party B.

1.4 after the formwork removal process, Party B shall clean up all materials related to carpentry in the floor.

Natural material loss: 1% for fasteners and zero for others.

3.

Once found, double compensation shall be made.

on the main body and machine room floor; It also includes unloading and handling of woodworking materials within 100m of the site.

3.

5.

8.

Including small tools and consumable auxiliary materials used in construction (Party A provides tower crane, elevator, floor power supply, wood formwork, wood square, cement strut, split bolt, wall bushing and release agent).

Party A shall be responsible for comprehensively coordinating the interleaved operation of each team to minimize the occurrence of idling.

2.3 Party B must obey the management of the project department, strengthen internal education, observe rules and disciplines, and prohibit fighting.

6、 Party A’s responsibilities: 1.

4、 Construction period: july2017 to december2017 5.

2.

If Party A fails to arrive at the site on time, Party A shall be responsible for compensating the idling expenses incurred.

Party B shall do a good job in protecting semi-finished products, and must clean up in a timely manner.

1.

3、 Construction scope: 1.

Timely manage the materials and tools used by the team, and cooperate with Party A in timely material demobilization; 5.

2.

1.2 Party B shall arrange a detailed construction schedule, monthly plan and weekly plan according to the total construction period and submit them to the project department.

Progress requirements: every four days after entering the standard floor, if the project is delayed due to this team, a fine of 5000 yuan per day shall be imposed to compensate the idling losses of other teams.

Click the blue word to pay attention to us in case of emergency ~ construction contract Party A: Project Management Department of xishanyue 2\ Preparation, erection and removal of formwork for wall column, beam slab, stair, post cast strip, air shaft, balcony railing, exterior wall decorative column, parapet, canopy and elevator, tower crane foundation, site sporadic components, etc.

Once found, such acts as theft shall be reported to the local public security organ for handling.

2.

According to the dust stained area of RMB /m2, it will be wrapped up at one time without any cleaning work.

4.

1.3 the formwork shall be erected in strict accordance with the dimensions of the drawing, and the formwork erection deviation shall be controlled within the allowable deviation range.

2.

7、 Party B’s responsibilities: 1.

Formwork selection, installation, removal, cleaning and painting of isolating agent; 2.

shall be signed and received, kept for use, and returned to the warehouse; 4.

Contracting method: labor cost for clearing (bring your own small tools and protective articles).

Reservation of holes with size ≥ 300mm at the construction position; 6.

The main equipment includes: tower crane and elevator.

If it is found that the safety helmets are not worn, each person will be fined 50 yuan at a time and operate in strict accordance with the operating procedures.

5.

If a safety accident occurs in violation of the operating procedures, Party B shall bear the responsibility.

Safety requirements: 2.1 Party B must be equipped with safety helmets, safety belts and other protective articles that meet the requirements in accordance with the ministerial standards and the relevant regulations of Hebei Construction Group.

Lifting Anchor

If Party B fails to deal with them in time within the time specified by Party a, Party A shall arrange other teams to deal with them, and the handling expenses shall be deducted from Party B’s task list.) It is forbidden to dismantle, smash or throw the formwork at random; During formwork matching, materials shall be used reasonably according to the construction scheme and technical disclosure.

In case of casualty accident during construction, if the cost of each accident is less than 30000 yuan after compensation by the insurance company, all losses shall be borne by Party B; If the cost of each accident is within 30000 to 70000 yuan, both parties shall bear 50% of the excess; In case of more than 70000 yuan, the excess shall be borne by the project department.

2.5 Party B shall pay the personal insurance premium for the team members when entering the site, which shall not exceed 100 yuan, which shall be paid by Party A in advance.

Party A is responsible for timely providing construction drawings and changes, guiding Party B’s construction, and taking charge of the surveying of the main axis and the setting out of the main structure.

If Party B fails to clean up in time, Party A shall deduct the cleaning fee from Party B’s task list.

If the construction is not carried out in accordance with the requirements, resulting in the failure of Party A and decoration, Party B shall bear the economic losses.