Budget estimate index is the expansion and combination of budget estimate quota.
It belongs to the nature of enterprise quota and is also the basic quota in engineering construction quota.
The weak current system integrated VIP group data will be constantly updated.
Its content includes three basic parts: labor quota, machine shift quota and material consumption quota.
It is a kind of quota applicable for construction enterprises to organize production and strengthen management within the enterprise.
The construction quota itself consists of three relatively independent parts: labor quota, machinery quota and material quota.
It takes the whole buildings and structures as the object, so as to prepare for the expanded unit of measurement.
Budget quota is the reference basis for economic activity analysis of construction enterprises.
3.
The content includes three basic parts: labor, machine shift and material quota, which is a pricing quota.
In order to better organize and manage construction production, construction schedule and construction operation plan must be prepared.
The quota used to calculate and determine the labor, machine shift and material consumption of the project is also a pricing quota.
Budget quota refers to the quota prepared for each sub divisional and sub divisional works of buildings or structures.
Budget estimate quota is the basis for preparing and expanding the budget estimate of preliminary design and determining the investment amount of construction projects.
2、 Budget quota.
The budget estimate quota is prepared for the expanded sub divisional and sub divisional works.
Differences among construction quota, budget quota and budget estimate quota 1.
2.
1、 The construction quota is a quota prepared by taking the construction process – process of the same nature as the research object and representing the comprehensive relationship between the quantity of production products and time consumption.
Budget quota is the basis for technical and economic comparison and technical and economic analysis of design schemes.
Budget estimate indicators are usually prepared separately for industrial buildings and civil buildings.
There are a large number of sorted and classified data for everyone.
The setting of budget estimate indicators shall be consistent with the depth of preliminary design.
Of course, the weak current data is not limited to this.
Budget estimate quota: budget estimate quota is the basis for preparing design budget estimate in the expansion preliminary design stage and revised budget estimate in the technical design stage; Budget estimate quota is one of the basic data for technical and economic analysis and comparison of design projects; Budget estimate quota is the reference basis for preparing the main material plan of the construction project; Budget estimate quota is the basis for preparing budget estimate indicators; Budget estimate quota is the basis for preparing bidding control price and bidding quotation.
It is a kind of valuation quota.
Budget quota: budget quota is the basis for preparing construction drawing budget, determining and controlling construction and installation project cost.
4、 Budget estimate indicators.
Construction quota: quota is an important basis for preparing project plan, organizing and managing construction.
3、 Budget estimate quota.
In the preparation of plans and the organization and management of construction production, various quotas shall be directly or indirectly used as the basis for calculating the demand for manpower, material resources and funds.