Download the word electronic version of the tooling decoration construction contract

Article 3: quality requirements 1.

♩♫.

5% the installation is completed.

1.

♩~♫.

♩~♫.

♪~♬..

If the contract needs to be terminated, the party who proposes to terminate the contract shall propose in writing, pay liquidated damages at 10% of the total contract price, and handle the procedures for termination of the contract.

Commencement date: June, 2016 Project completion date: July, 2016 The total project days are days.

Before the commencement, the construction is more than half.

2.

♩..

♪~♬..

The payment time and amount are 40% after signing the contract.

♪..

If the quality problem is caused by Party B, the rework cost shall be borne by Party B.

5.

Party A (owner): Party B: Telephone: Telephone: if Party A cannot communicate on site, it can authorize an agent with the same responsibilities as Party A.

♩♫.

♪~♬..

♩♫.

2.

♩~♫.

♪..

♪~♬..

♪~♬..

The warranty period starts from the date of completion acceptance.

♩~♫.

After both parties agree to handle the liquidation procedures and sign the termination contract agreement, this contract can be regarded as terminated.

♪~♬..

During the construction process, when Party A puts forward design modification opinions and increases or decreases the project, it must contact Party B in advance, and the construction of the project can be carried out only after confirmation, which affects the completion date agreed by both parties.

40% the masonry and carpentry are basically completed.

If Party A cannot organize the acceptance within the specified time, it must notify Party B in time and set another acceptance date.

92 document of the Ministry of construction of the people’s Republic of China and the principles stipulated in other relevant laws and regulations.

3.

2.

This contract and its annexes shall take effect after being signed by both parties.

After the acceptance of the project, the project quality shall meet the industry requirements, except for abnormal human factors.

Project completion: Party B shall notify Party A of acceptance three days in advance, and Party A shall organize acceptance within three days after receiving the notice.

♩~♫.

♩~♫.

This contract is made in duplicate, with each party holding one copy.

The construction scheme and budget of the design approved by Party A for this project, if the project is changed, it will be discussed separately.

♪~♬..

4.

Flat Rubber Recess Former

♪~♬..

♩..

♪~♬..

2.

♩..

After the contract takes effect after being signed by both parties, both parties must strictly abide by it.

♪~♬..

♩~♫.

♩~♫.

♩..

♩~♫.

Article 1: Project Overview 1 Project address: Houhu International Art Zone 2 House type and specification:_ Reconstruction of old plant__   __   __   __   __   __   __   3.

♩ the ball shares the ball and likes the ball..

The annexes to the contract have the same legal effect as this contract.

3.

♩..

15% the painting is completed.

The authorized agent of Party A is the entrusted agent: Telephone: date of signing: ◇ ♪~♬..

♩..

♪..

♩~♫.

♪~♬..

♪~♬..

♩~♫.

♪~♬..

♪~♬..

♩~♫.

Article 4: payment method 1.

The overall quality of the project is guaranteed for six months and maintained for life.

The material supplier of Party A shall be responsible for the quality problems caused by the materials provided by Party A.

♩~♫.

Article 5: change and termination of the contract 1.

The payment method of the project is listed in the table below: Party A pays in three times.

♩~♫.

The project implements dbj08-62-97 technical specification for commercial building decoration engineering, db31/t30-1999 acceptance standard for commercial decoration and other local standards and quality evaluation and acceptance standards formulated by the municipal construction administrative department.

The construction is basically completed.

Construction content: See Annex 4 of the contract project budget table for details Entrustment method: the specific mode is based on drawings and budgets.

If the quality of materials and equipment provided by Party A is unqualified and affects the project quality, the rework cost shall be borne by Party A, and the construction period shall be postponed accordingly.

5.

Click the blue word to pay attention to us in case of need ~ the entrusting party of the tooling decoration construction contract (Party A): the undertaking party (Party B): Project Name: Sino Italian industrial design (Hunan Co., Ltd.) in accordance with the contract law of the people’s Republic of China, the regulations on construction and installation contracts, the consumer protection law of the people’s Republic of China, and the price law of the people’s Republic of China, In order to protect the legitimate rights and interests of both parties and in combination with the specific situation of the project, both parties have reached the following agreement to abide by the Trial Measures for the administration of decoration of commercial projects (2012) No.

The final payment of the project is charged at 5%.

Article 2: total project price project price (amount in words) (¥ yuan) specific items shall be subject to the project budget table and construction drawings attached to the contract.

♪..

♩..

♩~♫.

♪~♬..

♩~♫.

♩..

During the construction process, if either party proposes to terminate the contract, it must propose in writing to the other party.

If either party needs to change the contents of the contract, it shall re sign a supplementary agreement after both parties reach an agreement through consultation.

Article 6: effectiveness of the contract 1.

3.

Both parties shall issue receipts for money transactions.