Dry goods | basement construction supervision control points, these monitoring means are detailed enough!

As a site supervision engineer, the construction of basement projects requires greater safety, and the technical level of the construction unit and supervision engineer is also relatively high.

Participate in the demonstration of support scheme and put forward supervision opinions.

Monitoring means: site supervision, observation, coordination of earthwork excavation construction site, measurement of excavation depth and excavation elevation.

After the excavation of the foundation pit, a drainage ditch should be set around the pit, a sump should be set up in sections, and the water collected in the foundation pit should be randomly removed.

2、 Monitoring points and means of foundation pit excavation construction (I) strictly monitor the construction process, excavate according to the support setting out after construction, and control the excavation time to ensure the strength of the support structure.

The upper part of the foundation pit is 1000mm away from the slope, and a intercepting ditch should be set around the pit to cut off the water flowing into the foundation pit.

Now the personnel must be aligned with the tenderee’s certificate.

(VIII) monitoring means for slope stability detection during earthwork excavation and underground engineering construction to the completion of backfilling: instruct the contractor to make a foundation pit slope stability monitoring plan and report the feasibility of the plan.

Monitoring means: inspect the support contractor and understand the successful examples of similar support projects that have been completed.

(II) on the basis of being familiar with the design requirements of the basement of the project and the engineering geological survey report, timely participate in the demonstration of the support engineering scheme organized by the construction unit, and actively participate in the review of the design drawings of the support piles organized by the construction unit.

Supervision suggestions can be made for support drawings, survey reports and surrounding environment.

Monitoring means: Patrol supervision, check whether the structure, section size and slope of the drainage ditch and intercepting ditch meet the requirements of the construction organization design, observe the intercepting ditch on the foundation pit and the drainage ditch in the foundation pit, and supervise the timely pumping of water..

(VI) review whether the foundation pit support monitoring plan conforms to the actual situation of the site, whether the surrounding control points meet the actual needs of the project, and whether the surrounding control and monitoring can meet the control requirements of the project.

(V) review the monitoring means of the construction organization design (or construction scheme) of the support engineering: decompose and demonstrate the construction organization design (or construction scheme), analyze its pertinence, rationality and operability, and focus on the key processes.

(II) earthwork excavation monitoring shall be carried out in layers according to the earthwork excavation construction plan (after approval), and the excavation depth of each layer is 0.5 ~ 0.8m.

It is forbidden to excavate in place at one time, which will cause rapid release of soil stress and cause deformation and damage of the support system due to excessive stress.

(IV) review the Contractor’s support structure construction equipment, incoming raw materials (cement, sand, stone, reinforcement, welding rod, flux and water stop materials, etc.), review the factory certificate, certificate of conformity and quality report, and conduct witness sampling and inspection as required.

When the earth is excavated to 20cm away from the design elevation, 10cm of foundation soil shall be reserved for manual slope repair to prevent over excavation, and the operation line of the excavator shall be monitored, The artificial damage of foundation soil caused by repeated rolling of excavator at the same position shall be avoided, and the damage of completed pile body by excavator shall be strictly prevented.

(III) water interception outside the foundation pit and drainage monitoring inside the foundation pit.

Monitoring means: review the qualification certificate, transportation permit, machine number certificate and other relevant data of the construction machinery and equipment of the support structure, and confirm that the construction machinery is in a normal state.

Monitoring means: further demonstrate and review the support design on the basis of preliminary demonstration, find out the key nodes in the support construction and supervision countermeasures, and ensure that the support engineering construction is effectively monitored by supervision.

In the project, the monitoring data of the control applied for inspection by the monitoring unit shall be reviewed every day.

1、 Scheme review and monitoring of support structure (I) review the qualification, equipment, previous project performance and personnel work license of the support engineering design contractor, determine the capacity of the contractor, and ensure that it meets the construction needs of the project.

Monitoring means: Patrol supervision, monitor according to the requirements of the approved construction organization design, check whether the sloping position of the foundation pit is coordinated with the support, and strictly control the earth excavation time to meet the strength requirements of the support structure.

The excavation elevation shall be controlled.

(VII) on site construction monitoring means of supporting structure engineering piles and water stop curtain: site supervision, monitoring of supporting structure piles in strict accordance with the requirements of pile body construction, monitoring points (detailed rules), and monitoring of water stop curtain in accordance with the requirements of water stop curtain construction.

During the detection period, the measurement supervision engineer of the Contractor shall retest and keep detailed records, and timely report abnormal changes to the director and the construction unit through the director, As the basis for further decision-making of foundation pit support.

Lifting Foot Anchor

(III) review the design, formulate supervision countermeasures, thoroughly understand the drawings, find out whether there are problems in the design, and formulate supervision countermeasures according to the drawings.

At present, most projects are accepted through bidding.

Monitoring means: be familiar with the drawings, digest the engineering survey report, understand in detail the geological characteristics of the project and the impact of soil quality on the support engineering, and focus on the support design requirements.

Those who are qualified are allowed to enter the site for use, and those who are unqualified are ordered to leave the site, select other materials, and then report for re examination until they are qualified.

Therefore, it is a routine procedure review in supervision, and only those who meet the qualification of bidding can be qualified.

Source: with the development of high-rise buildings in the city, the basement on the first floor has been basically common, and the number of basements on the second floor and above has also been increasing.

Let’s talk about our own views on how to control the basement construction supervision.

If it is serious, carry out emergency treatment.

The construction unit shall take measures to meet the requirements of alarm value, and timely hold on-site meetings, and timely feed back the problems to the design unit.