Han Tang decoration class: don’t worry about the decoration of the new house! Do you know the detailed process of decoration construction?

➤➤➤➤➤ water pipe · electric pipe ▲ the circuit is on the top, the waterway is on the bottom, and the pipe clamp spacing is ≤ 80cm…..

🔺 The medium-term construction process of Hantang decoration excellent design team is very critical.

The design of early measuring room ➤➤➤➤ measuring room & Design ▲ the quality of measuring room directly determines the effect of later construction…..

The floor tiles should be inclined to the floor drain, otherwise it is easy to accumulate water.

It should be noted that carpenters generally take a long time to make and need to communicate the design details in advance.

2.

 。。。。。.

Before the reconstruction of hydropower and water circuit, the demolition and modification of the main structure should be basically completed.

The basic process of bricklayer decoration: cleaning the base course – snapping lines – watering and wetting – treatment of plain ash base course – laying and leveling – paving – correction – filling joints.

Han Tang decoration knowledge small class home-towndecoration new house decoration pay attention to what not to understand the process, it is easy to be pit decoration will always encounter some conditions, such as: the socket is installed behind the bed, it can’t be used at all; Originally, I wanted to install the smart toilet, but the master didn’t leave the installation position; It’s agreed to store more, but there are too few lockers In order to make Xiaobai less detours in decoration, Hantang decoration has sorted out a systematic decoration process.

A lot of installation will rush in, and oneortwo things will be missed if they are not in good condition.

 。。。。。 When the wires are buried in the wall, there must be protective tubes.

The three kinds of wires should be distinguished according to their colors.

1.

It is very important to choose a good carpenter.

Don’t worry, Han Tang decoration helps you sort it out ➤➤➤➤➤ hard & soft…..

In fact, the decoration process can be simply summarized into three categories: ① preliminary design; ② Medium term construction; ③ Late closing part.

Specifically, it should cover the location after the water supply and drainage pipes are wrapped, the wall distance of the toilet water, the specific location of the floor drain, and the specific location of the heating; 2) Measure the length, width and height of walls and floors, the thickness of walls and beams, the height, width and wall distance of doors and windows, the height, width and wall distance of heating and other equipment in each room, so as to lay a foundation for design and decoration; 3) Know which walls are load-bearing walls according to the building type map; 4) Know the location of the water inlet pipe and how many pipes are connected after entering the house.

1.

🔺 Han Tang decoration bricklayer construction scene bricklayer precautions ✔ 1) Tiling is best done by one person, otherwise the final effect will be different; 2) It is best to use caulking agent for ceramic tile caulking, and clean it immediately after wiping; 3) When paving balcony tiles, pay attention to the direction of drainage; 4) Closed water test must be done for waterproof.

Painters enter the site, mainly to complete the wall base treatment, painting finish, and painting of some wooden furniture.

Circuits are divided into live wire, zero wire and ground wire.

Following the process and communicating with designers can help you avoid many “pits” in decoration.

Precautions for room measurement ✔ 1) Check the gas, floor drain, strong and weak current boxes, and mark the specific location.

Strong and weak electricity cannot be managed together.

(by analogy, the same is true of waterways.) The number of wires should not be “overloaded”.

This will lead to: TV often has snowflakes, WiFi signal is also very poor.

🔺 Han Tang decorative carpentry construction reality 5 wall construction wall construction process runs through the whole construction process, the construction period is long, and other construction projects will be carried out in the middle.

The quality of carpentry directly affects the aesthetic degree of the overall indoor effect.

 。。。。。 The measurement part before design is very important! The accuracy of the measurement room directly determines the transformation and interpretation of the house type by the designer, so we must ensure that the error of the measurement room is within the allowable value, and we should find a professional designer to participate in the measurement room.

The design part plays a decisive role! The design of early measuring room is very important.

If wallpaper is required, only the oiler needs to do the base treatment on the wall where wallpaper is planned.

Precautions for wall demolition ✔ 1) The wall shall be removed from top to bottom; 2) The removal of wall tiles should avoid damaging the line; 2.

Because the bare wire is easy to be aged and damaged after being buried in the wall, it is very troublesome to replace it in the later stage, so it is necessary to chisel the wall.

3 when the Tilers construct and decorate, the existence of the Tilers also contributes to the formation of the whole family.

4.

Generally, red and yellow are live wires, blue and green are zero wires, and yellow and green color wires are ground wires.

The cross section of wires placed in the sleeve shall not exceed 30% – 40% of the pipe.

Carpentry construction.

The quality of the plane layout design in the early stage will directly affect the final construction effect.

🔺 Han Tang decorative wall construction reality late installation closing stage when carpenters, bricklayers, painters, all completed, “construction link” is basically completed, officially entering the installation link! Installation is the last stage of hard decoration and the most cumbersome part.

If you don’t want your new home to be decorated in a mess, you must choose an excellent and reliable main designer in the early stage of construction.

🔺 Han Tang decoration hydropower acceptance reality hydropower precautions ✔ 1) Determine the basic specifications and placement of furniture and electrical appliances; Determine the lighting layout of the whole room; Determine whether there is demand for other household appliances in the future, so as to correctly plan the switches and sockets of the whole house; 2) Make an appointment with the hydropower Engineer in advance to plan the accurate positioning points and make the quantities budget; 3) Pay attention to the brand and quality of water pipes and wires to ensure the service life of hydropower lines.

For example: put three wires in one pipe, so it is not crowded and does not waste space.

The first measurement of cabinets should also be carried out between the two links of hydropower transformation and main body demolition and reconstruction.

The lines should be separated.

4) Remember: the bearing wall cannot be slotted for water and electricity transformation; 5) The principle of hydropower construction: “walk on the wall without walking on the ground, walk on the top without walking on the wall”.

Some workers try to save trouble by putting strong wires and weak wires in a tube or box.

Two Hole Anchor

Before the wall demolition construction workers smash the wall, the designer must mark the position of the load-bearing wall on the drawing, and must not smash it by mistake, otherwise the load-bearing capacity of the whole building will be greatly reduced.

Do not bury the bare wires in the wall.

It is troublesome to repair the wires without color separation in the later stage.