How many stages is the construction progress of the future house divided into? How many projects are there usually after the building is

2.

Railings, doors and windows can actually be made together with water and electricity pipelines.

After these are completed, the house can be basically handed over.

5.

There are still many subsequent projects to be operated, mainly for the structure.

According to national regulations, generally speaking, it takes 6 to 8 months to deliver the house after the capping, and after the capping, the quality of the house needs to be tested.

If it is a simple decoration room, it will be made with mortar.

7.

Foundation and foundation are excavation of foundation pit, cushion and foundation, and pile driving is also required for pile foundation.

For example, garden construction, road construction, including some fire-fighting facilities, etc., so the delivery time is not fixed.

3.

After the wall is built, the floor is made.

It mainly depends on whether it can be delivered on time in combination with the construction progress of the developer.

For property buyers, it can be determined according to the specific time in the contract.

In real life, the new commercial houses that people buy are often future houses.

How many stages is the construction progress of the future house divided into? 1.

After finishing the main body of the frame, start building walls on each floor.

9.

Capping does not mean that the whole project has been completed.

The floor has been waterproof, including roof waterproof and toilet waterproof.

In the concrete structure, the specific embedded time is after binding the reinforcement and before pouring.

4.

6.

But in fact, there are still many projects to be done after the capping of future houses, so how many projects are there usually after the capping of real estate? How many stages can the construction progress of the future house be divided into? Let’s take a look at the relevant professional knowledge.

At this time, it should be noted that some embedded pipelines of hydropower pipelines have been embedded when making the main structure.

If the house is delivered with decoration, it must meet the decoration standard.

I hope this article can deepen your understanding of relevant professional knowledge…

The site is leveled and three connections (water, electricity and roads) are made.

There are rainwater and sewage, gas, heat, tap water, electricity, weak current integrated pipe network, etc.

Erection Anchor One Sided

The above is what Xiaobian combed for you about how many projects are usually left after the capping of the building, as well as the construction progress process of the future house and other related knowledge.

8.

How long can the house be delivered after the capping? 1.

How many projects are there usually after the building is capped? After capping, there are exterior decoration, water and electricity installation, public area decoration, and basic indoor decoration.

Backfill after the foundation is completed.

There is no need to make the floor again.

If there is no basement, backfill to 200-300 below plus or minus zero.

3.

If there is a problem of delayed delivery, the developer can be held accountable.

The capping of the building is equivalent to 90% of the completed project.

As mentioned above, capping is only the completion of the main part of the house, which is only one stage of the whole project progress.

2.

After the capping, it does not mean that the construction of the whole community is over, because there are still many follow-up projects to be completed, including the supporting facilities of the community.

in the outdoor area, there are landscaping projects and road construction in the community.

Because when buying a house, the developer will sign a contract with the buyer, and the contract will clearly show the specific delivery time.

There are still many projects to be done before delivery.

As the main body, the main body actually starts from the foundation ring beam, binding reinforcement, formwork erection, pouring, until the building is capped, all the way according to the construction drawings.

Some buyers will think that if the future houses are capped, the whole project is almost completed.