2.
if Party B does not obey the management of Party A, ¥ 200 will be deducted from the project payment for each occurrence.
3.
Contracting scope: all contents of drawing design, Party A’s requirements and design changes, etc.
Party B shall be responsible for the on-site unloading and storage of the materials required by the contract.
In any case, if the project is found to be inconsistent with the quality specified in the contract, Party A has the right to refuse to pay any payment for the project.
4.
2.
Requirements for required materials: ⑴.
2.
Brand: optional.
6.
This contract is a fixed unit price, which is subject to the actual workload approved by both parties.
Pier foundation: 80cm*80cm 80cm.
1、 Project overview project name: ***** production and installation of shed.
In case of conflict between the above specifications, the higher one shall prevail.
Project address: North Qingfeng road and East Xinmin Road, Huaiyang county.
After 12 months, the project has no quality problems, and the quality deposit will be returned without interest.
The mobilized materials must hold the product certificate, test report, product specification, quality inspection certificate, composition, color, variety, production date and other relevant technical data, and meet the corresponding national quality standards.
This contract is a “turnkey project”.
2.
2、 Project contracting method and contract price 1.
3.
The construction site where the “Provence” community is located.
3.
Click the blue word to pay attention to us in case of need ~ lczy-ht-gcb-101***** shed production and installation construction contract Party A (seal): ***** Party B (seal): date of signing: shed production and installation construction contract Party A: ***** (hereinafter referred to as Party A) Party B: (hereinafter referred to as Party B) according to the contract law of the people’s Republic of China In accordance with the provisions of the regulations of the people’s Republic of China on the quality management of construction projects and relevant laws and regulations, Party A and Party B sign this contract on the construction of ***** shed based on the principles of equality, voluntariness, good faith and friendly negotiation for mutual compliance.
Sunshine board: the warranty period is 10 years.
If any product is found to be substandard during acceptance, all mobilization materials in this batch will be deemed to be substandard, and Party A has the right to require Party B to return and replace all materials, and deduct part or all of the quality deposit.
The remaining 5% is the quality deposit, and the warranty period is 12 months.
5.
Party A has the right to inspect the material suppliers and reserves the right to veto the material suppliers whose quality and regulations do not meet the requirements.
All contract main materials and related auxiliary materials must be purchased in strict accordance with the requirements of the contract, and the quality must all meet the requirements of Party A and design standards.
Construction period: January 10, 2016; Completion period: February 3, 2016; Total construction period: 25 days; 2.
Contracting method: contract labor, materials, quality, construction period and safe and civilized construction.
Party B must complete the construction according to the contract period, otherwise, Party B will be given a financial penalty of 500 for one day overdue.
Without the written consent of Party A, Party B shall not subcontract or subcontract the scope of the contracted project in any form.
7、 Material mobilization and acceptance: 1.
4.
The quality of all mobilized materials must be inspected, accepted and signed by the personnel designated by Party A.
Contract price: the unit price of the project for the fabrication and installation of the shed (including tax): ***** yuan / ㎡; (total price = actual quantities x unit price), with quotation list attached (calculation method of quantities: calculated according to the vertical projection area of the ceiling).
Material: see the quotation list for details.
6、 Quality standard: 1.
until the completion acceptance is passed.
Once it is found that Party B subcontracts or subcontracts the project, Party A has the right to unilaterally terminate the contract.
The written agreements or documents of both parties on the negotiation and change of the project shall be regarded as an integral part of this contract.
Contract content: ***** shed production, installation, testing, finished product protection, acceptance, delivery materials, etc.
Before handling the project payment each time, the bid winner shall submit the project payment application to Party A, and Party A shall review and confirm it according to the actual completion within 15 working days from the date of receiving it, and pay in accordance with the contract.
5、 Construction site and technical requirements: 1.
There is no advance payment for this project.
Party B must complete the commencement preparation before the commencement date specified by Party A, and submit the commencement application report to Party A.
The construction period specified in the contract remains unchanged, and the acceptance cost of this batch and the economic losses caused thereby shall be borne by Party B..
3.
Party B shall obey the management of Party A.
95% of the contract price shall be paid within 10 days after the fabrication and installation of all sheds are completed and Party A passes the acceptance (full invoice shall be provided when applying for the project price).
4.
5.
Party B shall be responsible for all losses such as material loss before handover.
The contract unit price is all the expenses required to complete the construction drawings and all the works and work within the scope required by Party A, including material procurement, processing and manufacturing, transportation, on-site coordination, on-site construction, material secondary handling, safety production, (semi-finished product protection), finished product inspection and acceptance, quality assurance and maintenance, profits, taxes and other related expenses, as well as all the risks specified in the policy documents involved in the contract Costs of responsibilities and obligations.
4、 Payment method 1.
Strictly implement the following national industrial standard “welding specification for building steel structure” jgj81-2002; Unified standard for acceptance of construction quality of building engineering GB50300-2001; Code for quality acceptance of Building Decoration Engineering GB50210-2001; If there is a new version of the above specifications and related technical standards, the latest version at the time of ordering shall prevail.
Meet the relevant national energy conservation and safety standards, and meet the requirements of Party A and drawings.
2.
7.
Party B shall be responsible for the transportation, insurance and other matters of the contract products before they arrive at the construction site, and Party B shall bear all costs and risks before the delivery acceptance.
3、 Construction period and others: 1.
Concrete grade: C25.