The subcontracting system is good and the assessment is strictly controlled.
The process is standardized and the operation is mechanized.
The construction must be civilized because of the dust from water residue.
Model tree benchmarking, benchmarking and win-win! Intelligent construction site, industrialized construction site, good first piece recognition, summary and guidance.
The team has a system, with 100% real name, assessment, rewards and punishments, and the first thing is clear! Four systems of scientific and technological innovation are effective, funds are guaranteed, four new applications, and process innovation! 15 key positions for quality improvement, lifelong responsibility system, quality control risk, and timely clearing of problems! The construction team plan is complete, the site is strictly implemented, the three inspection system is implemented, and the traceability is done in a closed loop.
Improve 12 training and assessment of soft power, stimulate people’s growth, first-line teachers and apprentices, and workers enter school! Wages and insurance, rights and health, conditions and environment, one cannot be less! Skills have improved, treatment has also improved, and then look at the big competition, the most beautiful craftsman! I have the highest strength with strong quality culture, good publicity and leading Party building!..
High quality and durability can be guaranteed.
Machinery replaces labor, protection has demonstration, risk grading control, hidden danger closed-loop management, and emergency response is not relaxed! The 8 sensitive items of green environmental protection must be monitored, and the protective measures are complete.
Land conservation and timely rehabilitation! Make full use of solid waste, save energy and reduce costs, and take many measures to reduce emissions.
Only qualified materials can be released.
First piece approval system, complete archives, after approval and improvement, promote and control the whole audience! The material system is strict.
Quality safety control process, assessment is not relaxed! Focus on hidden corners and tackle common problems.
The organization should be sound and the 9000 system should be excellent.
The indicators must be strict! Ping An construction site has 6 Ping An exams over the years.
Only green can protect the environment.
Mnemonic words for the decomposition of six indicators (level III) of the quality engineering evaluation of the construction unit 18 construction organization and creation quality, with the goal firmly remembered.