Rainproof measures for all kinds of electrical equipment used in the open air.
It is important to check whether there are hidden dangers in the structural conditions of temporary facilities and fences.
Before the flood season, whether the rainwater, sewage pipelines and other sewage pipelines are dredged, cleared and maintained.
Click the blue words above to add attention + precautions for construction in summer flood season flood control requirements: (I) all construction enterprises and their project departments should strengthen the inspection and monitoring of foundation pit excavation and earthwork construction.
(IV) during the rainstorm, all construction enterprises and their project departments should stop construction operations, closely monitor the safety status of the site enclosure, foundation pit support, vertical lifting machinery and equipment, and the site drainage, so as to prevent major safety accidents such as enclosure collapse, foundation pit collapse, equipment overturning, electric shock and large-area ponding on the site; In case of major danger, measures shall be taken immediately in accordance with the requirements of the emergency rescue plan, evacuate the on-site personnel to the emergency shelter, and timely report to the relevant departments.
3.
Whether the emergency plan for heatstroke prevention has been formulated.
6.
2.
2.
Adequate drainage facilities shall be provided to ensure timely drainage and prevent foundation pit collapse.
5 whether the building, warehouse, equipment and facilities are inspected regularly.
2 lightning protection and grounding of tower crane.
Whether the external elevators, cross frames, gantry and other elevated facilities higher than the building at the construction site are equipped with lightning protection devices according to the specifications.
Temporary electricity management 1.
(VI) all construction enterprises and their project departments should strengthen the safety inspection of the construction site in densely populated areas, take immediate rectification measures for those with unsafe hidden dangers, and resolutely dismantle those that cannot guarantee personal safety, so as to prevent collapse and falling objects from injuring people.
Whether the emergency rescue plan for flood control is formulated and practiced.
Whether lightning protection grounding or anti-static facilities such as equipment and facilities are in good condition.
For high-temperature workers, whether drinks and heatstroke prevention drugs that meet health requirements are provided.
9.
(2) All construction enterprises and their project departments should strengthen the use and management of equipment and facilities such as formwork support system, scaffold, tower crane, people’s and goods elevator, material elevator, etc., and focus on the inspection of whether the disassembly and assembly team has professional contracting qualification and safety production license, whether special operators work with certificates, whether the sensitivity of various safety devices of various equipment and facilities, and whether the setting of wall attachment connections meet the specified requirements Whether the foundation setting and drainage facilities meet the specified requirements, so as to improve the rain, lightning and overturn resistance of equipment and facilities.
The protective railings around the foundation pit must be solid and reliable, and drainage facilities must be set; Pay special attention to the stability of soil mass, and take effective measures in time if cracks and signs of collapse are found.
(V) the construction site should timely sort out and clean up all kinds of building materials and construction waste, and do a good job of floor cleaning.
(3) All construction enterprises and their project departments shall timely eliminate the potential safety hazards of temporary facilities and fences.
If there are unsafe hidden dangers, rectification measures should be taken immediately.
During the rainstorm, it is not suitable to stack materials in the floor of the project under construction, and if it is really necessary to stack, fixed measures should be taken.
Construction site safety production checklist in summer flood season project name inspection date construction unit supervision unit inspection item serial number inspection internal content inspection results flood control management 1 “summer heatstroke prevention, lightning protection, flood control, wind prevention and other safety production work notice” communication and implementation.
Whether the key monitoring parts for flood control have been determined on site.
4 whether there is a duty system to clarify the duty personnel and their responsibilities.
4.
Check whether the on-site lighting and power lines are mixed and leakage..
Whether a leading group for flood control work is established and its responsibilities are implemented.
Those that cannot guarantee personal safety should be resolutely demolished and rebuilt to prevent collapse accidents.
Whether the quantity of flood control materials meets the flood control requirements of the unit.
7.
3.
8.
Formulation and implementation of anti soaking measures for tower crane foundation.
4 lightning protection of the temporary color board room located in the open area.
2 rain proof measures for various power boxes and switch boxes.
Whether effective control measures have been formulated for open-air operation to ensure construction safety, such as staggering the operation time and reasonably avoiding high-temperature periods.
Lightning protection management 1.
Focus on the inspection of foundation pit support, and set observation points at the construction site to observe the changes of foundation pit slope and adjacent buildings and structures at any time, so as to eliminate potential safety hazards in time.
Heatstroke prevention management 1 whether the employees are publicized and educated about heatstroke prevention and cooling.
Those that need reinforcement should be reinforced.
3.