Specific measures for construction quality accident prevention and revision of emergency plan

The production and business operation entities shall, in accordance with the requirements of the emergency plan, provide corresponding emergency materials and equipment, establish service status files, and conduct regular inspection and maintenance to keep them in good condition.

Strictly follow the basic construction procedures.

Projects without in-depth investigation, analysis and strict demonstration cannot be finalized blindly; The construction can be started only after the engineering geological and hydrological conditions are thoroughly understood; Review design without certificate and construction without drawing; It is forbidden to modify the design arbitrarily or not to construct according to the drawings; The project shall not be put into use without commissioning and acceptance.

03 carefully carry out the project site investigation.

The production and business operation entities shall timely report the revision of the emergency plan to the relevant departments or units, and re record in accordance with the procedures of the emergency plan.

The opinions of the State Council on persisting in developing safety scientifically, promoting safety development and promoting the continuous and stable improvement of the form of work safety pointed out that the system of work safety emergency plans should be established and improved, and dynamic revision and improvement should be strengthened.

The spacing between boreholes is too large to fully reflect the actual situation of the foundation; The drilling depth is not enough, so it is difficult to find out the underground soft soil layer, landslide, tomb, hole and other harmful address structures.

Strengthening construction safety and environmental management is also an important measure to prevent construction quality accidents.

The geological survey report must be detailed and accurate to prevent uneven settlement and instability of the foundation, cracking, damage and collapse of the superstructure and wall due to the wrong foundation scheme based on the geological data that do not conform to the actual situation.

The foundation shall be scientifically reinforced and treated.

In case of any of the following circumstances, the emergency plan shall be revised in a timely manner: the subordination relationship, business mode and legal representative of the production and business operation entity are changed due to merger, reorganization, transformation, etc; Changes in the production process and technological production of the production and business operation entity; The surrounding environment changes, forming a new major hazard source; The emergency organization and command system or responsibilities have been adjusted; Changes in laws, regulations, rules and standards; The emergency plan drill evaluation requires revision; The emergency plan management department requires revision.

The measures for the management of emergency plans for production safety accidents stipulates that the emergency plans formulated by production and business units shall be revised at least once every three years, and the revision of the plans shall be recorded and filed.

– construction management of construction projects..

The feasibility demonstration must be done before the establishment of a construction project.

According to the engineering characteristics of different foundations and the principle of combining foundation treatment with superstructure to make them work together, comprehensive consideration shall be given from the aspects of foundation treatment and design measures, structural measures, waterproof measures, etc.

Fixing Socket Cross Pin Nail Plate

The uneven foundation such as soft soil, filled soil, miscellaneous fill, collapsible loess, expansive soil, rock outcropping, karst rock and soil cave shall be scientifically reinforced.

Many construction safety and environmental accidents will be associated with quality accidents.

During the site investigation, the drilling position and drilling depth shall be properly arranged.

01 carry out construction organization management in strict accordance with the law, carefully study, strictly abide by relevant national policies and regulations and mandatory provisions of construction, carry out construction organization management in accordance with the law, and take the fundamental measures to prevent construction quality accidents from the source.