Those visa items that are most likely to be missed at the construction site!

It must be remembered that the visa should not be delayed until the commencement of work, and it should be done at least once a month, which is also the principle of long-term visa.

This is a fair rush cost, but in fact, everyone didn’t want it.

[roof] roof is often changed by Party A.

If the negotiation fails, it will ask Party A for a visa and withhold its project funds.

If there is a construction period requirement during the construction, you should check it yourself first.

Therefore, the visa added to the template is particularly important.

There is also the template added for rush work.

Some list measures are not clearly listed, causing trouble in subsequent settlement.

The transportation distance of earthwork naturally depends on whether it is beneficial.

If it is beyond the scope, the transportation distance must be signed.

If it is not specified, it is likely to be cut directly for you.

It is recommended to refer to relevant publications for more understanding.

Otherwise, the supervisor of Party A cannot be assessed for a long time, and it will be troublesome to supplement the signature in the later stage.

During the construction, Party A has no right to add clauses, saying that it can’t be capped for a few months, and how much will be fined for delaying a day.

If it is impossible to stack enough backfill soil on site under the conditions of narrow site or unstable slope, the outward earthwork volume and haul distance shall be signed.

It’s not easy for people who work hard outside.

[precipitation and drainage] the drainage in the quota is only the drainage of surface water and a small amount of open water.

If the damage is not serious, you can sign the loss rate of the brick and the secondary use to remove the ash scar, slag, etc.

At the same time, it also reminds us: 1.

The price of digging wet soil is higher than that of dry soil, and the price of digging silt is higher.

Because in the bidding, most of the soil is piled on site, and the remaining soil is transported out.

In the foundation construction, the brick formwork is used in response to the requirements of Party A to speed up the progress or considering the instability of the slope and the need to backfill as soon as possible.

If the foundation construction is suspended or postponed, it should be signed.

Pay attention to the well point.

[template part] now a lot of projects are priced with lists.

Some things audit is unreasonable~~ Recommended reading ~ ~ project visa, progress payment, settlement audit, these points must be mastered! What are the six problems that should be solved in the implementation of list quotation? What is the preparatory work? What is the impact of canceling the approval of engineering cost qualification on the industry?..

Wheel Spacer

[masonry part] the most common occurrence of masonry is that it is demolished and demolished.

3.

It’s nothing.

If the conditions are enough, don’t take a small sump to fool, and be careful to wear the upper.

If Party A does not agree on the progress or the agreement is not detailed enough, it can try to postpone the work to strive for claims in its own favor.

The pump shift is not cheap, so the pump model should be written.

After these leaders who like to change invented a new roof practice, it will look good to recalculate the unit price.

If the excavated soil is transported away and backfilled, it will not be counted as money if the cost is not signed.

It is no problem to demolish the wall, but the visa must explain the damage degree of the brick (otherwise the audit will directly reduce the material for you).

Concealed records should also be as detailed as possible, that is to say, at least: hole depth, pile length, reinforcement cage length, empty section length, pile diameter, rock depth.

The price of brick formwork is higher than that of formwork erection.

This is similar to the template part.

Although it can be argued, it is always good to do things ahead.

if you master the know-how, you can cut in at a low price when bidding.

Everyone knows that the oil price is so expensive now.

If there are underground obstacles, it should be verified, and the cost of clearing underground obstacles is not cheap.

The road to struggle depends on tenacity and perseverance.

[earthwork part] groundwater is not considered in earthwork bidding.

According to the legal construction period or the bidding construction period, how much speed Party A requires now, and how many sets of templates will be added? The calculation in this is quite complex.

When calculating the unit price, don’t forget the exhaust pipe and pipe fittings of the insulation layer, the oil impregnated wood wool board of the surface protective layer and the caulking of ointment.

If it is enough for visa, it’s good to form a habit.

If water seepage is seen in excavation, the height of groundwater level can be verified.

Although you don’t have much money, it’s not cost-effective to be cut down.

If it is not beyond the scope of the list, it is OK.

If there is no requirement at the time of bidding, it can also be signed.

It’s not that you have finished product protection of marble when you shop it, but that you have done finished product protection seriously.

Of course, if the work is stopped for a long time, it must be recorded and the work must be stopped.

Even if you surround the scene with a bamboo pole and spread a broken sack, you should prove it as soon as possible.

2.

The only thing that needs to be noticed is that overtime also increases a series of efficiency reduction costs such as machinery operation salary.

You should give as much as you sign.

If a large amount of drainage or quicksand treatment, you can need a visa.

In addition, if the water seepage is large, you can also prepare a construction plan to apply for drainage and dewatering measures and slope support measures.

During the foundation construction, if the work is stopped due to rain or the construction period is delayed due to Party A’s reasons, the drainage and precipitation expenses can be signed according to the unit shift.

If Party B also participates in this work, it can negotiate with Party A.

If it encounters rocks, it should sign the depth of rock entry in time.

The template is one solution.

If it has requirements, it should be mentioned in the contract, and the additional requirements should be paid.

[finished product protection] finished product protection is not innate.

There’s a safe and sound way in the world.

These can’t be checked afterwards.

If you can’t get the well point, you should strive for the dewatering of the pump.

If you can’t beat you down, you’ll eventually be strong [vertical transportation].

[pile foundation part] in addition to making records of concealed works, the pile foundation should also pay attention to the visa of underground obstacles.

The construction unit shall be responsible for the three supplies and one leveling on site.

[cooperation fee] I didn’t expect that the cooperation fee can also be visa, right? The cooperation fee is just that you provide water supply, electricity, scaffolding, vertical transportation and other cooperation for other subcontractors to complete their processes (note that the water and electricity fee is not included in the cooperation fee, depending on how the contract stipulates), but if the subcontractor damages or pollutes your things, it will not ask him for it at all.