During the construction of Longcheng street in Taiyuan, Shanxi, some lanes are closed. Please take a detour

If there is any infringement, please inform us and we will deal with it in a timely manner-.

Pay attention to safety and pass in an orderly manner.

The contents and opinions in the text do not represent the position of this number.

Lifting Clutches

The pictures, articles and fonts are all from the Internet.

At that time, the two-way six lanes of this section will be temporarily adjusted to two-way four lanes, the traffic lanes will be reduced, and the traffic capacity will be reduced.

According to the construction arrangement of Longcheng street access project (Taihang Road – hexu Road), from 0:00 on August 11 to 24:00 on December 30, part of the motorways within the project scope of Longcheng Street will be occupied for construction.

Do not jump in line to rush.

Please slow down the vehicles passing through the construction section in advance and be courteous to each other.

The purpose is only for your consideration and research.

[note] this number respects originality.