How to construct epoxy floor? The most complete piece of writing, no one!

epoxy main material and curing agent in proportion, add 1.5 times of No.

▲ Henghe Yongsheng ▲ Tianjin Yushen building [advantages] 1.

Why are micro cement and micro cement tiles so popular? 6.

Show enterprise recommended ▲ Huizhi diamond light ▲ sanjeshu coating ▲ litek: 13925595097 · milling machine · milling machine bottom · milling finished ground ② primer coat the primer evenly on the plain ground with a trowel.

Cement self leveling PK epoxy self leveling, which type do you prefer? 3.

According to different weather conditions, the drying time of the primer is generally 4-8 hours.

6 quartz sand, stir evenly, and evenly lay it on the primer with a serrated trowel, with a thickness of about 1mm.

What do you know about the solidified floor? 7.

If the leveling process is adopted, the defects of poor ground flatness can be effectively covered; 2.

③ Intermediate coating: after mixing the intermediate coating a / B agent, i.e.

If the self leveling process is adopted for the surface layer, the mirror effect can be achieved.

When the construction site is open, the shot blasting machine can be used for construction.

The cost is relatively high and the maintenance cost is high.

The mesh number (particle size) of quartz sand can be appropriately adjusted according to the ground flatness· Intermediate coating material processing · two times of intermediate coating connection ④ grinding and batch coating.

Self leveling ground leveling construction process 2.

How to solve the difficulties of low-temperature construction of epoxy floor? 9.

1 the base material of the epoxy floor construction requires that waterproof adhesive tape shall be laid for moisture-proof treatment before the base concrete construction (the material is PE or PVC); The strength of ground concrete structure shall be above C25; The original slurry shall be pressed and polished, and the cement powder shall not be spread when finishing, otherwise the surface will be too dense and hard, which will affect the bonding force; Before epoxy floor construction, the base material concrete must be cured for 28 days and fully dried; The epoxy resin material can be laid only when the moisture content is below 8%.

After the intermediate coating is completely dry, grinding shall be carried out.

Construction scheme of carborundum wear-resistant floor (complete version)! 4.

Construction of carborundum wear-resistant floor and curing agent 5.

Acid, alkali, salt and oil corrosion resistance, especially good alkali resistance; 3.

Fear of the sun and easy to change color; 2.

The surface is smooth and beautiful.

[disadvantages] 1.

Construction scheme of epoxy resin self leveling floor (complete version) 8.

Small cracks on the base material and cracks on the ground can be covered with epoxy resin, and the surface coating can be applied only after a complete and smooth surface is obtained· Medium coating polishing ⑤ surface coating: after the surface coating a / B agent is uniformly mixed according to the proportion, the coating is applied by roller, and the coating is evenly distributed by “cross” method.

After the first surface coating is dried, the second surface coating shall be constructed in the same way.

Rebar Cap

If it is completely absorbed by the substrate, it can be coated repeatedly with a thickness of about 0.15mm.

Use special roller to brush resin.

Floor dry goods: I will teach you how to treat the old cement floor as floor paint Disclaimer: today’s terrace platform release, excerpt.

Wear resistance, pressure resistance, impact resistance and certain elasticity.

The advantages are deep grinding lines, fast construction speed and low dust· Shot blasting machine · absorbing particles · when the size of the finished ground room is small or the shot blasting machine at the foot of the column wall cannot work, the milling machine can be used to treat the concrete base; The disadvantage of the milling machine is that the dust is large and the milling grain is shallow.

Self leveling epoxy floor flat coating epoxy floor based on the ground engineering example of a production workshop, come to the site to see how the epoxy floor is constructed.

(inspection of plastic film laying on the ground) · laying PE film · raw slurry calendering 1 construction preparation for epoxy floor construction 1 on-site interpretation of epoxy floor construction process ① base treatment: grind and remove impurities in the plain ground and roughen the concrete surface.

Check the primer coating.

Construction method of cement self leveling floor 10.

Personnel can enter after 48 hours, and heavy machinery can enter after seven days.

The thickness is about 1mm· Top coating roller · top coating construction excellent enterprise recommendation ▲ xiupo chemical ▲ July 15-17, 2022 ▲ August 13-15, 2022 ▲ October 19-21, 2022 ▲ selected articles 1.