Party B shall be fully responsible for any personal and property damage caused by any third party other than the construction personnel due to Party B’s negligence in the management of the construction site.

③ The interior wall shall be plastered, and the facade and side facade of the exterior wall shall be plastered with face bricks.

♩ ~ ♩.♬♩♩♩♩♬♩♩♩♪♬♩♩♩♩♪♩♩♩♪♬♩♩♩♩♩♬♩♩♩♩♬♩♩♩♩♩♩♩♩♩♩♩♩♩♩♩♬ ~ ♬.

♩.

If some parts fail to meet the quality requirements during construction, they shall be reworked.

② Floor slab shall be cast-in-situ layer by layer (including stairs, doors and windows, lintels).

♪ ~ ♬.

The construction contracting mode of the house building is Party B’s contracting and Party A’s contracting.

♩ ~ ♩.

If the quality requirements are still not met after rectification, Party A has the right to unilaterally terminate the contract, contract another contract, and clear the site according to 50% of the labor cost of Party B’s completed project.

♪ ~ ♬.

♩.

Pfeifer VS Box

♪ ~ ♬.

Project quality grade: meet the acceptance standard specified in the construction specification.

♩ ~ ♩.

♩ ~ ♬.

♩ ~ ♩.

♩ ~ ♪ ~ ♩ ~ ♪ ~ ♬ ♩..

After the construction drawings are confirmed by both parties, they can not be changed at will.

Party B shall be responsible for the construction and solve all the equipment required for the construction by itself.

During the construction, Party B shall pay attention to the construction safety and take full responsibility for the construction safety throughout the whole process.

♩ ~ ♩.

10000 yuan (in words: ten thousand yuan) shall be paid in full.

Foundation construction includes foundation trench excavation, earthwork backfilling and compaction.

In case of quality problems within one year, Party B shall repair them unconditionally.

♩ Ball sharing ball praise ball watching..

♩ ~ ♪ ~ ♬..

4、 Special requirements and instructions: ① the depth and width of foundation excavation shall be determined according to the construction drawings and geological conditions.

Click the blue word to pay attention to us in case of unexpected needs – house construction contract Party A: Name: Address: Party B: Name: Address: Party A will contract the construction project of the self occupied house located in to Party B through negotiation by both parties, and both parties agree through negotiation, The following agreements have been reached on the construction contracting of the house building project: I.

3、 Payment method: RMB 5000 (in words: five thousand) for commencement payment.

All material and labor losses caused shall be compensated by Party B.

This agreement is made in triplicate.

The top payment for the first floor is 15000 yuan (in words: fifteen thousand).

Party A and Party B each hold one copy, and the witness holds one copy.

Party A shall be responsible for all the raw materials used for the construction.

If it is necessary to change, both parties shall agree after consultation.

5、 This Agreement shall come into force as of the date when Party A and Party B sign (or seal) this agreement.

♩ ~ ♩.

The unit price of Party B’s construction contracted house is 210 yuan per square meter (in words: two hundred and ten yuan only) (with toilet), and the square area is bounded by dripping water; Gate: 3500 (in words: three thousand and five hundred yuan only); Stairs: one step 150 (in words: one hundred and fifty yuan only); Enclosure: RMB 100 (in words: one hundred) per square meter.

Party A’s signature (seal): Party B’s signature (seal): witness’s signature (seal): signing time: mm / DD / yy (Gregorian calendar) Signing place: ♪ ~ ♬..

2、 The building area of the house to be built is square meters, and Party A will contract all the construction of the house building works including the ground beam to Party B (including the tiles of the inner and outer walls, the indoor floor tiles, the stairs and their ancillary facilities, the floor tiles of the toilet, the kitchen operating table, the pan Kang, the tile spreading, etc.).

♪ ~ ♬.

♩.

♩.

Pay off the remaining amount after completion (the remaining two thousand yuan is used as the quality guarantee, and pay off the remaining two thousand yuan if there is no quality problem after one month).

The water and electricity expenses required in the construction process shall be paid by Party A, and the food, housing and transportation of the construction personnel shall be borne by Party B.

Party B shall take full responsibility for all casualty accidents caused by the construction equipment and the operation errors of Party B’s personnel, which has nothing to do with Party A.