Septic tank project construction contract word electronic version download

2、 Construction period: the project shall be completed within 20 days after the commencement of the project.

♩ ~ ♩.

♩.♬♩♩♩♩♪♬♩♬♩♩♪♬♩♩♪♩♩♪♬♩♩♩♩♩♩♩♬♩♩♩♩♩♬♩♩♬♩♩♩♩♩♩♩♩♩a~ ♬♩♩♩♩♩♪♬♩♩♩♩♩♩♩♩♩♩♩♩♩♩♩♩♩♩♩♩♩♩98..

♩.

♪ ~ ♬.

Earthwork excavation and backfilling; ②.

♩.

The top plate shall be changed into reinforced concrete cast-in-place slab with a thickness of 200mm and a reinforcement of ∮ 12@150 Double layer two-way configuration ④.

Party B shall carry out construction in strict accordance with the construction acceptance specifications and engineering design drawings issued by the state.

2。 Contracting method: contract labor and materials.

♪ ~ ♬.

♩ ~ ♩.

There is no advance payment for the project.

♩ ~ ♩.

Construction contracting content: the construction shall be carried out according to the drawings, including ①.

Party B: according to the contract law of the people’s Republic of China and the construction law of the people’s Republic of China, according to the specific contents of the project, through friendly negotiation, both parties have reached the following agreement.

6、 Safety responsibility: in case of any safety accident and other losses caused by Party B during the construction, Party B shall bear the responsibility.

♩ ~ ♩.

1、 Project overview this project is the 10 # brick septic tank of Xinhua capital phase II outdoor supporting project, and the location is designated by Party A on site.

3、 Project quality grade: the quality grade required by the project is qualified.

♩ ~ ♩.

7、 This contract is made in quadruplicate, with Party A and Party B holding two copies respectively.

♩.

Click the blue word to pay attention to us in case of emergency ~ construction contract for ancillary works (septic tank) Party A: Guangshan Boda Real Estate Development Co., Ltd.

♩.

Both inside and outside are painted ⑤ All wall thickness shall be constructed in strict accordance with the drawings.

4、 Contract amount and payment method: the total contract price (including tax) of the project is (in words): forty thousand yuan only (20000 yuan / unit, two units in total).

♩.

♪ ~ ♬.

Magnetic Box

♩ ~ ♬.

The well cover shall be provided by Party A; ③.

♩ ~ ♩.

The engineering construction drawings are attached to this contract and have the same legal effect as this contract.

♩.

If there is no quality problem after six months after the acceptance is qualified, Party B will make a lump sum payment.

Party A: Party B: Date: ♪ ~ ♬.

♩.

4.

After the completion acceptance is qualified, Party B will issue a formal invoice and pay 95% of the total price, and the remaining 5% will be used as the quality guarantee.

The commencement date is mm / DD / 2014.

If the project cannot be completed on schedule, a fine of 500 yuan will be imposed for each day of delay, which will be directly deducted from the project payment of Party B.