Daqin College ┃ seven taboos in the relationship between supervision and construction units

It is not the purpose to find out the problems, but to require the construction company to take the problems found by the supervision engineer seriously and actively rectify them; To avoid similar problems in future work.

When carrying out work, the supervising engineer should pay attention to: for problems that can be solved within the scope of his own responsibility and authority, the owner should not be used as a “shield” to try every possible way to evade or prevaricate.

As time goes by, it may also form opposition.

He bent down and picked out the mud.

The supervising engineer shall, within the scope authorized by laws and regulations and the contract, strictly reform his duties, stand in a fair position, and independently solve problems in his work.

The supervisor is also a human being, and it is inevitable that he will not understand something.

7、 Avoid corruption and trading power for money.

3、 Don’t only find fault, but don’t give advice.

The words and deeds of the two supervisors are disdainful and respectful, and the results are quite different.

To achieve the goal of creating excellence in the project, in addition to the strict internal control of our internal management, the supervisors are also an indispensable external important force.

6、 Avoid copying mechanically and following the book.

The author once heard a story: an older supervisor and a supervisor who had just joined the work went to the construction site to inspect.

The supervision personnel should also learn from the hardworking and optimistic construction workers.

The article comes from the public account: First, civil engineering supervision should not ignore principles and be harmonious.

We are more willing to cooperate with the strict supervision”.

There is nothing wrong with the supervisor looking at the construction company from the standpoint of “fault finding”.

Only by achieving the above three points, not only seeking truth from facts, but also keeping pace with the times, can supervisors not humiliate their mission.

It’s terrible to be stubborn and pretend to understand.

Because the owner entrusts the supervision engineer to supervise, that is, to entrust the supervision engineer to coordinate and constrain the construction and solve the problems in the construction, not just to ask you to collect data.

Otherwise, it is not conducive to solving the problem, but also affects the development of future work.

They should often go deep into the construction site and be familiar with all aspects of construction; 2.

The management methods and construction technologies of these construction enterprises should also be learned by the supervision unit.

A few supervision practitioners think that they are superior to others in exercising the project supervision right on behalf of the owner, and look down upon the construction personnel who directly deal with dirty, tired, dangerous and bitter processes.

In order to achieve this goal, supervisors must do three things: 1.

Fixing Socket Cross Pin

It will be difficult to restrict the construction unit completely with theoretical and ideal models.

It can be seen that the key to do a good job of their own work is for supervisors to put their minds right and put the construction company, especially front-line operators, on an equal footing with themselves.

Only when supervisors can not only look at problems from the perspective of “standard” but also think from the perspective of “transposition”, can they improve their own working ability and drive the continuous progress of supervision.

The supervision unit and the construction unit are first of all the relationship between the supervisor and the supervised, which is a unity of opposites.

The young supervisor saw a piece of mud in the gravel of an old worker’s shovel, and said to the old worker, “Hey, pick out this piece of mud!” The old worker did not seem to hear it, so I did.

2、 Avoid being superior and not speaking of etiquette.

Therefore, the supervision engineer is required to know not only the causes but also the causes of the problems found in the work; At the same time, they should also put forward their own opinions on how to deal with these problems; In addition, we should pay attention to ways and means in the work, not only to let the technicians of the construction party accept their suggestions happily, but also to maintain their dignity in front of the construction team.

This kind of “good” relationship outside the Golden Jade has damaged the foundation of supervision work, which neither the construction unit nor the farsighted construction unit wants to see.

Only when the supervisors apply the work style of integrating theory with practice and deal with various problems in the construction with a practical and realistic attitude can they cooperate with the construction unit.

In the current non-standard construction market, the profit space has been compressed to a minimum, and the construction enterprises may lose money if they are careless..

It doesn’t matter if you don’t understand.

It is normal for the supervising engineer to find fault in his work, but it is not enough to do so.

The geographical environment, human environment, project characteristics and solutions of construction projects are ever-changing.

At this time, the older supervisor next to him didn’t say a word.

A supervisor with correct conduct and taking principles as his guide to action will win the true respect of the construction team in the end, even though he may not be understood at the beginning, but “the fragrance of flowers is fragrant”; In an interview with the author, the person in charge of a large state-owned construction enterprise said: “Good project quality is the foundation for the survival of a construction enterprise.

In fact, the current fierce market competition has honed a large number of strong construction enterprises with strong strength, good reputation and advanced management.

We should learn, learn, and re learn, constantly improve our knowledge literacy, and be familiar with the new norms, new materials, and new technologies of the industry; 3.

Since then, no impurities affecting the construction quality have appeared in the materials of the construction site.

Otherwise, there will be ambiguities in the work, when the “good guy” deviates from the problems of principle, the supervision will become a deaf ear and a vassal of the construction unit, losing the significance of establishing the “third party supervision”.

Be modest and prudent, and lose the wrong “face concept”.

5、 Avoid criticizing everything and not looking at results.

This relationship has been clearly defined in the supervision contract and the construction contract.

Therefore, the supervision engineer should constantly strengthen the ability to find, analyze and solve problems, so as to establish his own image in the construction, improve his prestige, win the dependence of the construction unit, and facilitate the smooth development of the work.

However, if this standpoint of “fault finding” is changed to “looking at problems with tinted glasses”, the result will only be counterproductive.

4、 It is forbidden for the owner to “block the arrow” and evade the problem.