Look! Enclosed construction, please detour!

Please follow “safe Nanyang” to easily control the “micro police station”.

It is recommended that vehicles with north-south traffic needs bypass Zhongjing Road or Kongming road.

Waved Anchor

The planned construction period is 43 days.

Construction section: the intersection of Guangwu road and industrial road is completely closed.

It is recommended that large vehicles and other vehicles that need to travel at high speed should choose Nanyang station to get on the expressway.

Recently, these three roads in the urban area are under closure construction 01 closure time: 22 March 16, 2022 to 20 April 2022, with a planned construction period of 35 days.

02 closing time: from 22 March 16, 2022 to 20 April 2022, with a planned construction period of 35 days.

Construction section: Dushan Avenue (section from zhangheng road to Xinchen) is fully closed.

Editor: Xie long reviewed by: Guo Tao..

Non motor vehicles pass through the temporary access road according to the sign.

The temporary inconvenience is for long-term convenience.

Xinchen road and zhangheng road can pass normally.

03 closing time: from March 13, 2022 to April 25, 2022.

After the repair is completed, it will be more convenient for everyone to travel! Click below to follow.

Nanyang micro police station specially reminds motor vehicles to bypass the above road section as far as possible.

At present, 2600000 + people have followed and joined us.

Motor vehicles need to detour.

The intersection is completely closed.

When passing through the intersections around the road section, please follow the bypass tips, traffic signs and markings, and obey the traffic police command.

Construction section: small vehicles from Dushan station to Baita section of Kongming road can pass along the non motorized lane, but large vehicles can not pass.