The influence of humidity on the construction of epoxy resin flooring?

How does the humidity affect the construction of epoxy resin flooring? See the micro editor for solutions.

The influence of humidity on the construction of epoxy floor is as follows: 1.

If the humidity is too high, the paint surface may not be dry, so that the next construction plan cannot be carried out, affecting the project quality and progress.

Therefore, I believe that the construction work should be carried out in an appropriate environment to ensure the smooth completion of the project and reduce the maintenance work in the later period…

Therefore, if the air humidity is too high, the operation needs to be forced to stop, which is to ensure the construction effect of the project.

Plate Anchor

Once the humidity exceeds this limit, the surface coating paint of the floor may crack, peel off, crack or even whiten.

The same is true for ordinary buildings and terrace buildings.

Therefore, if the humidity is too high, the construction will be very difficult.

If the humidity of the construction environment is too high, many small water droplets will condense on the site, which will have a serious impact on the construction progress.

Generally speaking, the humidity should not be too high.

Therefore, the construction shall be carried out under the condition of appropriate humidity.

We all know that the construction of a building project should be combined with the actual weather conditions and the site environment.

3.

Once it violates the objective requirements of construction, it may have some impact on the construction of the building project.

2.

During the construction of various floors, there are certain requirements for the weather, such as temperature and humidity.

Dry environment is required during floor construction, so that various coatings can be attached to the ground, and the effect after floor construction can meet the requirements.

If the air humidity is too high, it will bring adverse factors to the construction of the floor, and this series of impacts will lead to the reduced completion effect.

In addition, the coating shall be completely dried during the construction of each coating, so that the next step can be carried out.

During construction, the air humidity is generally required to be below 85%.