[tips] in coordination with the construction of the section of S4 Hujin Expressway entering the city, the surrounding ground road traffic

The specific changes are as follows ↓ Construction overall diagram ▲ 1.

Schematic diagram of non motor vehicles and pedestrians bypassing ▲ the public security traffic police department specially reminds passing vehicles and pedestrians to adjust their travel routes in time and pass according to traffic signs or the command of on-site management personnel.

Vehicle detour diagram ▲ 2.

Removal of non overpass approach bridge on Yindu Road: non motor vehicles and pedestrians passing by can bypass along Duyuan Road – Tianyuan Road – Yindu Road.

Closure of Hongshen Road (Chunshen Road~West Gate of New Space Home): Hongshen Road from Chunshen Road to West Gate of New Space Home is closed, and residents along the line can detour from Wanding Road and Xinzhu Road.

Social vehicles and buses passing through this area can bypass along Hongshen Road – Meilong West Road – Xinzhu Road.

The ramp of Xinzhu Road on the east side of S4 is closed.

Loop Box

Vehicle bypass diagram ▲ 3.

According to the municipal public security bureau, in order to cooperate with the construction of the S4 Shanghai Jincheng Expressway urban section (Xinzhuang Interchange Jindu Road) to improve the traffic function of the project, the traffic organization of the ground roads around the project has been adjusted by stages since September 16.

Data: Chen Ting, editor of the Municipal Public Security Bureau..

No motor vehicles are allowed to pass through the overpass of Xinzhu Road: no motor vehicles are allowed to pass through the overpass of Xinzhu Road across S4.