The new century underground parking lot is a Qinglong lane and a Zhongshan Road.
Closed section: the one-way line of Heping Road (Yan’an Road Lanjiang Bridge) section is closed in sections, with barriers on both sides of the road to the roadside trees, and pedestrians and non motor vehicles are allowed to pass on the sidewalk; Vehicles are allowed to pass through the underground parking lot of New Century and the underground parking lot of Sanjiang Building and the side exit of Heping Road.
Closing time: September 13, 2022 to December 31, 2022.
1.
The underground parking lot of Sanjiang building is Heping Road, Tongqing street and Zhongshan Road..
C.
B.
Renmin South Road Yan’an Road Zhongshan Road.
2.
Traffic bypass scheme: A.
Closed construction of road upgrading and reconstruction of Heping Road (Laodong Road – Yan’an Road) in Lanxi City.