on November 25, 2022 (vehicles going to Guangzhou): please try your best to bypass Ganzhou Ring Expressway → Kangda Expressway (Fushi Interchange) → Nanlong Expressway (Jiangdu Interchange) → Daguang Expressway → Guangzhou, Shenzhen and Dongguan.
on November 5, 2022 to 24:00 p.m.
Source: Shaoguan published intrusion and deletion..
Warm prompt: During the traffic control period, please choose the planned route in advance for passing vehicles, abide by the traffic rules, and drive in a civilized manner.
To avoid congestion, please pay attention to the navigation software and check the real-time road construction information.
Due to the construction needs of the comprehensive civil maintenance special project of Shao Gan Expressway from 2021-2022, the section from Nanxiong Station to Shixing North Station in Guangzhou direction of Shao Gan Expressway will be completely closed.
The passing drivers should control their speed, drive carefully, follow the guidance of traffic signs along the way, and obey the command of the on-site public security traffic police, road administration personnel and staff.
Control time: from 8:00 a.m.
During the closed construction period, vehicles will be diverted from Nanxiong Station to National Highway 220, driving along the National Highway, and arriving at Shixing North Station on the expressway; In addition, the entrance of Nanxiong Station is closed, the entrance of Mashi Station and the exit in Guangzhou direction are closed, and passing vehicles can drive out of the expressway through Nanxiong Station and enter the expressway through Shixing North Station.