2 word file download of landscaping project construction contract

Responsibility for breach of contract.

3、 Project content: 1.

7、 Party A entrusts Party B to be responsible for the management and coordination of the construction site.

According to the specific situation of the project, the contract is signed by both parties through consultation.

The green land is turned 50 cm deep and processed 20 cm (including land leveling, terrain building, etc.); 3.

Wire Lifting Loop

Party B shall construct according to the design drawings provided by Party A, and Party A shall accept according to the drawings; 2.

8.

After the completion of the project, Party B must maintain it for one year (deciduous trees are planted this winter and next spring, starting from the planting of specific tree species); 4.

Party A: Party B: Legal representative Legal representative Contact person: Contact person: Date: Date: Contract template
.

The construction unit (Party A) of the landscaping project construction contract: the construction unit (Party B): according to the relevant national and local regulations, Party A entrusts the landscaping project to Party B for construction.

2、 Construction site and scope: The project is located in, with a total green area of square meters.

After completion settlement, Party A has paid, and Party B delivers the project to Party A, the terms will be terminated.

For the third payment, after the project acceptance, Party A shall pay 20% of the total cost; 4.

Party B’s responsibilities: (1) If the project quality does not conform to the provisions of the contract, Party B shall be responsible for repairing or reworking without compensation, and the resulting losses shall be borne by Party B.

During the construction process, if rework is required due to Party A’s reasons, it shall be settled according to the facts after being approved by Party A’s visa; If the seedlings die due to Party B’s reasons during the maintenance period, Party B shall replant them according to the contract specifications; 5.

Party A’s responsibility: (1) After receiving the acceptance notice from Party B, Party A shall organize the acceptance on schedule in a timely manner.

(2) Party B must ensure that the construction task is completed within the construction period.

For the second payment, Party A shall pay 25% of the total cost after half of the turf is paved; 3.

1、 Project name: greening project.

6、 Construction period: the project is completed from to.

4、 Project cost: The total project cost is 3 million yuan (three million yuan), which is lump sum.

The balance shall be paid in lump sum after the one-year maintenance period expires and is qualified.

10、 This contract is made in quadruplicate, with each party holding one copy and each party holding one copy of the drawing budget.

If it cannot be completed on schedule except for force majeure factors agreed by Party A, it will be fined for each day of delay_________ Yuan.

For the first payment, after the contract is signed and takes effect, Party A shall pay 50% of the total cost; 2.

The laying gap shall not exceed one finger width.

9、 Effectiveness and Termination of the Contract This Contract shall come into force after being signed and sealed by both parties.

The planting quality shall be accepted according to the requirements of the relevant municipal departments for the greening project.

Party A delays the acceptance and pays Party B liquidated damages for each day of delay_________ Yuan.

The lawn shall be laid according to the terrain, with high flatness, strong integrity and natural flashing.

Click the blue letter to pay attention to us in case of emergency.

(2) If Party A fails to pay the project payment in accordance with the time and amount specified in the contract, it shall pay Party B liquidated damages at the rate of one thousandth of the project price for each day of delay.

5、 Payment method: 1.