The ceiling materials include plastic steel plate, aluminum gusset plate, gypsum board, wood board, etc.
The owner can choose from two aspects according to the ceiling, one is the material, the other is the shape.
The owner must pay more attention to water and electricity detection to avoid potential hazards.
After determining the decoration scheme, the owner should not change it easily to avoid wasting human and material resources.
The water and electricity installation steps are: snapping the line for positioning, slotting, wiring, testing, sealing the groove, and taking photos to keep the bottom.
For the installation of furniture and household appliances, the general merchants will provide free door-to-door service, and the owners do not need to bear additional costs.
The bearing wall and bearing structure of the house cannot be removed and changed, which will affect the life of the house.
3、 Before the hydropower transformation, the construction party will draw the water and electricity route map of the house.
There are many advantages for the owner to know clearly in advance.
The modeling of suspended ceiling includes plane roof, linear roof, etc.
2、 Most owners of the main demolition and renovation have the need to adjust the house structure.
6、 Wall construction The main steps of wall construction are to level the wall, paste grid cloth, apply putty, apply emulsion paint, and paste wallpaper.
At the same time, in order to save costs, the floor of the house is much cheaper to use composite boards than solid boards.
1、 After the house design owner determines the decoration company or construction team.
The following is a small compilation of the contents of the decoration construction process step table, which can be seen by the owners who need it, and is very beneficial to the decoration.
The pollution elimination methods include: window ventilation, plant elimination, activated carbon, etc.
It not only saves money, but also looks beautiful.
7、 For the installation of cabinets and wardrobes for furniture and household appliances, the owner shall measure the area in advance for customization, so as to facilitate the immediate installation in the later period.
4、 For buildings with high floors and low floors, the installation of suspended ceilings can be designed without suspended ceilings.
Second, ensure the decoration construction progress.
The owner can move in formally only after cleaning.
The water and electricity circuit diagram can reduce the decoration errors and ensure the construction progress.
High quality house design scheme can not only improve the appearance and texture of the house, but also avoid many decoration traps.
The decoration company will enter the site to measure the building area, send designers to design, estimate the decoration cost, estimate the decoration materials, etc.
At the same time, the location of water, electricity and heating for the house shall be submitted to the property management and gas company for review, and the owner shall not change it without authorization.
At this time, it is necessary to dismantle and rebuild the wall.
5、 The main steps of ground installation and ground construction are to level the ground, lay cement, tile, beautiful joint skirting, and stick wood floors.
In consideration of living safety, owners should not use marble slabs throughout the house, which will increase the floor bearing pressure.
At the same time, the owner must remove the original thermal insulation layer of the clean water house, otherwise the wall will be easy to peel after two or three years.
The contents of the decoration construction process step table are summarized here…
If the wall base is not properly treated, the service life of the wall will be greatly reduced.
First, avoid the decoration company from cutting corners.
8、 To eliminate pollution, house decoration will produce a lot of harmful gases.
The house decoration process has strict specifications and standards.