Burst! The pile driver at the exit construction site of a subway station in Hangzhou overturned, please pay attention to detour

Fixing Socket Cross Hole Nail Plate

Zhang said: Because it may be affected by the rain today, the bolts of the pile driver fell off because of the wet slide, causing the pile body to roll over.

The overturned pile body weighs 5 tons and is a hollow structure.

Source: FM93 Voice of Traffic (hifm93) Reporter: Li Jin received a report at about 9:50 a.m.

At present, the traffic police have closed the corresponding roads, and the scene is being handled quickly.

Mr.

Zhang, the person in charge of the construction party.

At present, Shiqiao Road to Xinfeng Road and Airport Road to Xinfeng Road are closed in both directions.

on March 17 that the pile driver at the construction site of Xinfeng Road Subway Station C of Hangzhou Airport Rail Express turned over and occupied the lane.

Just now, the official microblog of @ Hangzhou Metro released a message: At about 9:40 a.m.

In addition, 93 reporters learned from the traffic police Jianqiao Squadron that the overturned pile driver is on Yicheng Road.

At 11:00, the crane is lifting the fallen pile.

Please pay attention to detour nearby vehicles.

Since the accident occurred at the construction site, there was no damage to personnel and equipment.

on March 17, a construction method stake at the construction site of the auxiliary structure of the fresh air shaft of the Hangzhou Airport Rail Express collapsed, temporarily blocking traffic, and no casualties were found at the site.

FM93 voice of traffic emergency broadcast reminds all owners: please pay attention to detour! FM93 Voice of Traffic Zhejiang Emergency Broadcasting continued to pay attention ↓↓.
.

After receiving the explosion, 93 reporters rushed to the construction site as soon as possible.

The construction party closed the road at the first time, contacted the subway company for rescue, and tried to restore traffic in about two hours.

It is expected that the traffic will be restored before 2 o’clock.

What is the current situation of the construction site? How about the traffic conditions around? At the construction site, reporter 93 interviewed Mr.