For the visa items that are most likely to be missed at the construction site, Party A should also give them if it doesn’t want to!

Brick formwork is used in the foundation construction in response to the requirements of Party A to speed up the progress or in consideration of the unstable slope and the need to backfill as early as possible.

Everyone knows that the oil price is so expensive now.

Because most of the bidding takes into account the site soil piling, and the surplus soil is transported outside.

The price of digging wet soil is higher than that of dry soil, and the cost of digging silt is higher.

Remember not to delay the construction period until the commencement of the work.

At least once a month, this is also the principle of long-term visa.

If the construction period is delayed due to rain or Party A’s reason during the foundation construction period, the drainage and precipitation costs can be certified according to the machine shift.

2.

The underground water is not considered in the bidding of earthwork.

If the site is narrow or the slope is not stable enough to stack enough backfill soil on the site, the outbound earthwork volume and haul distance shall be verified.

[Earthwork] 1.

Otherwise, the supervisor of Party A will not be able to assess for a long time, and it will be very troublesome to supplement the signature later.

The earthwork haul distance is naturally to see whether it is beneficial.

If there is water seepage in the excavation, the height of the underground water level can be verified.

Of course, if the construction period is suspended for a long time, it is necessary to record the suspension period.

Two Hole Anchor

In addition, if the water seepage is large, the construction scheme can also be prepared to apply for drainage and dewatering measures and slope support measures.

3.

If it does not exceed the scope of the list, the haul distance should be signed.

If there is no requirement at the time of bidding, it can also be certified.

If the excavated soil is transported away, and then backfilled, the cost will not be calculated unless it is clearly signed.

If there are underground obstacles, it should be verified.

The price of brick formwork is higher than that of formwork erection.

The cost of clearing underground obstacles is not cheap.