If the picture and text involve copyright issues, please contact us in time.
The base is too rough and the shaking speed is too fast; 2.
4.
What kind of primer should be used for real stone paint? How to apply putty fast and labor-saving? How to deal with blistering on putty? Understand the three causes of blistering, and reasonably solve the problem of blistering.
The moisture content of the base course is too high, and the density is too large or too small.
After a period of construction, the cracks and bubbles on the surface are mainly caused by uneven mixing.
The putty layer for one-time construction is too thick, greater than 2.0mm; 3.
In the environment where the wall is too dry or with strong wind and light, first wet the wall with clean water as much as possible, and then apply the putty layer after there is no open water on the wall.
Due to its rich voids and high moisture content, the putty is not breathable, and the air is sealed in the void cavity, which is not easy to eliminate.
Putty powder construction? Listen to the teacher Fu who has ten years of decoration experience! The reason why the tiles fall off is that this “white powder” recommends articles worth deep thinking for you every day! We pay attention to the dissemination of high-quality articles, and thank the original author for his hard work.
5.
Common phenomenon of putty powder scraping in batches: bubbles occur during the construction process and after a period of time, the putty surface bubbles.
2.
Every gram of cellulose is a promise! Hebei Xuguang Cellulose Co., Ltd.
Generally, the putty is mixed evenly, left for about 10 minutes, and then mixed again with an electric mixer before being put on the wall.
In case of blistering on the second or last surface layer during construction, the squeegee shall be used to remove the blister before the watermark is removed to ensure that there is no bubble on the putty surface.
4.
Address (Add): Zhaoxian Industrial Park, Hebei Tel: 0311-89119388 15833920507 E-mail: xghpmc@126.com 。
.
If there is a large area of blistered putty surface, use a spatula to directly break the small blister, and then use a suitable putty to scrape the blistered surface.
2、 Solution 1.
After construction, a large amount of water is absorbed and swells to form cracks.
1、 Causes: 1.
For the particularly rough wall surface, the thick putty shall be selected as the base material as far as possible.
3.
The slurry contains powder particles that cannot be dissolved in time.