The equipment in the multi-connected air conditioning room is neat, and the refrigerant pipe is arranged beautifully ● 28.
Muffler positioning is accurate, installation is firm, operation is reliable, and blocking is in place ● 44.
The installation height of the water collector is uniform, and the insulation is tight ● 40.
The high and low voltage distribution cabinets are installed firmly and arranged neatly ● 4.
The mechanical and electrical installation adopts BIM technology, the space layout is reasonable, and the pipeline is three-dimensional layered ● 5.
The end appliance is arranged in line, and the light belt is straight ● 33.
The hot water room pipe is floor type rack, with tight insulation, Identifications are neat ● 29.
The layout of the fire pump room is reasonable, and the identification is clear ● 37.
The project archives are clearly catalogued, complete, authentic, effective and traceable ● 10.
The bridge installation is straight and beautiful, and the jumper connection is standard ● 2.
The interface is tight, and the soft joint is exquisite ● 22.
The lightning protection grounding jumper connection is effective ● 7.
The equipment in the security room is arranged orderly, and the system operates normally and reliably ● 27.
The anti-corrosion measures for the gate valve stem are in place, and the identification is eye-catching ● 38.
Source network collation, if there is any infringement contact, delete all the textual research data and add the editor’s WeChat hlxf686 to receive and share it is a joy! Forwarding is our driving force! ● 1.
The equipment and bridge in the electric well are arranged reasonably, the identification is neat, and the plugging is beautiful ● 32.
The elevation of the equipment of the same model is consistent, and the arrangement is neat, and the equipment foundation is equipped with a seated spring damper, Vibration and noise reduction, stable equipment operation; ● 15.
The bridge is tightly sealed through the floor, and the work is fine ● 13.
The support is equipped with spring damper, which has remarkable effect of vibration and noise reduction ● 24.
The air duct is tightly blocked through the wall, and the work is fine ● 39.
The air conditioning water pipes are arranged in order, Clear identification ● 41.
The pipeline installation is firm, the identification is standard, and the slope direction is correct ● 3.
Distribution box identification is uniform, and installation is neat and beautiful ● Equipment in the pressure stabilizing pump room on the 45.46 floor is neat, and painting is exquisite, and valves and bolts are protected with PVC sleeves.
.
The project uses photovoltaic power generation, technology guidance, and green construction ● 18.
The section cable laying is standard and neat Bind firmly ● 34.
The pipe spacing is uniform, the pipe fitting elevation is consistent, and the identification is eye-catching and clear ● 25.
Screw unit installation is stable and firm, and vibration reduction measures are in place ● 42.
The equipment foundation adopts the seated spring damper ● 16.
The air duct interface is straight, and the connection is tight ● 8.
The space layout is reasonable, and the pipeline insulation is tight and beautiful ● 19.
The corridor lamps in the equipment area are installed in a line, simple and atmospheric ● 35.
The high and low voltage distribution cabinets are installed firmly, Orderly arrangement ● 9.
The equipment is grounded, set in a standard, safe and reliable manner ● 17.
The transformer is installed firmly and arranged neatly ● 26.
The equipment is firmly installed, reliably grounded, effectively damped, and operates smoothly ● 14.
The pipeline is tightly sealed through the wall, and the work is fine ● 11.
The air conditioning host is arranged reasonably, the operation is stable, the pipeline is horizontal and vertical, the system identification is correct, clear and beautiful ● 30.
The phase sequence of the distribution box is accurate, the identification is clear, and neat and beautiful ● 12.
The ground of the tube well is fine, the pipeline is arranged in order, and the fire prevention plugging is tight ● 20.
Equipment installation is stable, orderly, effective vibration reduction, and stable operation ● 43.
The cable is bound firmly, and the identification is orderly ● 21.
The sanitary ware is installed in the middle Smooth drainage ● 23.
The lightning protection grounding test point is set reasonably and the workmanship is exquisite ● 6.
The tube well is close to the space, the workmanship is fine, and the wall and floor are blocked tightly ● 31.
The anti-corrosion measures for the gate valve stem are in place, and the identification is eye-catching ● 36.