The original stations such as “East of Mountain Star City, Dongyang, and Heping Village” will not be stopped temporarily.
Solid Lifting Socket Cross Pin
In this way, the Nanjing section of the fast track between Nanjing and Zhenjiang is basically unblocked, and the rapid transformation of the Zhenjiang section of National Highway 312 (including Jurong and urban areas) will only be completed.
Recently, some stops on this bus have been adjusted.
195 Due to the construction needs of the reconstruction project of the Zhenjiang Jurong Section of G312 National Highway (Longqi Line to Heping Section), according to the traffic organization requirements of Zhenjiang Traffic Management Department, the bus No.
Temporary Adjustment of Bus No.
It is also a rapid transformation, with both main (elevated) and auxiliary roads.
The significance of the rapid transformation of the Ningzhen section of G312 National Highway After the rapid transformation project is opened to traffic in 2024, it will be more convenient between Nanjing and the main city of Zhenjiang.
In the future, the transportation between Ningzhen Town will be more convenient! The above is comprehensively sorted out by “Qixia Life Circle”.
Regarding the total length of the Zhenjiang section of G312 National Highway: 36 kilometers, including 14 kilometers for the Zhenjiang urban section and 22 kilometers for the Jurong section; Total investment: 6.8 billion yuan, including 2.83 billion yuan for Zhenjiang urban section and 3.97 billion yuan for Jurong section; Road standards: the standards adopted at both ends are consistent, and the main road is separated from the auxiliary road.
It is reported that this section of the main line expressway has been opened to traffic (there is still a small section under construction at the border).
Temporary addition: north of the main station of Mount Regency Star City.
The details are as follows: Temporary adjustment of the 195 Road Initial and Terminal Station: Qixia – North of the Shishan Xingcheng Terminal Station.
Please make travel arrangements in advance.
The main road is constructed according to the standard of two-way six lane first-class highway, and the design speed is 100 km/h; The auxiliary road is designed and constructed according to the urban road design, with a design speed of 30-50 km/h.
▲ Route map of the original 195 Road ▲ Adjustment of 195 Road will be restored to the original route after the completion of construction.
The Nanjing section of G312 National Highway has been renamed Zhigu Avenue, and the road from the city boundary to Dongyangfang Interchange is unblocked.
195 will be temporarily adjusted from the first bus on March 30, 2023 (Thursday).
Continuing towards the main city of Nanjing is the Xuanwu Avenue, which has been renovated a few years ago, or the two are integral in themselves, but with different names.
Pay attention to us, Qixia big events, small things, and trivial things can be known without leaving home! Disclosure, suggestions, and questions can all be sent to us privately in the background, and there is also a chance to join the fan exchange group..
.