Hydropower Stage Another Happy City.
Huaxia Four Seasons · Mid term Acceptance Designer: He Wei Area: 141 ㎡ Type: Flat Floor Project Manager: Cheng Long ▲ “Lehuo Tile Opening Process” to prevent water seepage and make it beautiful.
Mid Stage Acceptance Rongchuang Cultural Tourism City.
Completion Stage Dianchi ONE.
In the previous review of the construction site, please click here to review the article: Jindi Yunhai No.1 · 336 ㎡ Type: Villa Ancient Yunnan Future City · 500 ㎡ Type: Villa Langji Zijing Mansion · 375 ㎡ Type: Villa Nord Mountain Sea Spring Wind · 346 ㎡ Type: Villa Country Garden Longchuan Mansion · 213 ㎡ Type: Villa Different Happiness City · 210 ㎡ Type: Dapinglou Longhu Tianpu · 131 ㎡ Type: Pinglou Photo Source: Fang Lijie, Wu Huangxian Yang Jianguo, Bai Yingchun.
.
Hydropower Stage Designer: Bai Xingyong Area: 118 ㎡ Type: Flat Floor Project Manager: Li Qiu ▲” Lego Wago Connector Process “Lego Wago connector wiring, simple wiring, reliable connection, high temperature and high pressure resistance, flame retardant nylon material, low contact resistance, aging resistance, easy maintenance, imported from Germany, and stable quality.
Hydropower Stage Splendor Sunshine.
▲ “Shielding Treatment Process for Strong and Weak Current Intersections” The strong and weak current intersections are wrapped with aluminum foil paper, which is not prone to generate strong and weak current electromagnetic interference during later use.
Happy Garden Decoration conducts weekly spot checks on the construction site to ensure the professionalism and precision of construction.
Our professional team will carefully examine every detail, from the selection of materials to the implementation of construction processes, to ensure the quality of each owner’s home.
We adhere to the professional attitude and skills to complete each process, and strive for excellence, only to create a better home environment.
“Another Happy City.
▲ “Lego Ceiling” 7 “Splicing Process” Lego Decorative Lego Ceiling “7” Splicing Process avoids stitching at corners, using the entire plate to resist deformation and cracking, and reduces joint cracking.
Hydropower Acceptance Stage Designer: Zhang Wei Area: 836 ㎡ Type: Villa Project Manager: Zhao Guojun ▲ “Large Bend Process for Wire Tubes”: Large bends should be used for the turning of the wiring tubes in the circuit, which facilitates the pulling and pulling of wires and the later replacement of old wires.
▲ “Lehoo wire slot crack prevention network process” cement mortar is used to repair the wire slot, and then the crack prevention network is pasted to ensure that the wire slot does not crack in the future.
This week, we will take a look at the construction site – Splendor Sunshine.
Mid Stage Huaxia Four Seasons.
Mid Stage Acceptance Another Happy City.
▲ “LOHAS Shared Trap Process”: The sink water and floor drain share a common trap; Washing your face, washing your hands, and brushing your teeth every day can ensure that there is enough water in the water trap to thoroughly resolve the odor return phenomenon.
“Another Happy City · Midterm Designer: Gu Heng Area: 210 ㎡ Type: Large Flat Floor Project Manager: Bai Jiyun ▲” Door and Window Protection “In order to avoid collisions and scratches on doors and windows during construction, Jiayuan will use protective film to protect the entrance door frames, handles, fixed fans of indoor windows, kitchen and bathroom gas meters, water outlets, water meters, indoor heating distribution boxes, and other facilities before construction, to protect the finished product from damage.
The wire pipe joints are coated with PVC adhesive, and then wrapped with waterproof adhesive tape to prevent moisture intrusion at the wire pipe joints, leading to wire corrosion or short circuit.
The perpendicularity of the wooden base course of the door jamb is tested.
▲ “Lehuo Tile Leveler Tile Laying Process” Tiles are smoother and more beautiful.
Completion Stage Designer: Li Xiaoyan Area: 125 ㎡ Type: Flat Floor Project Manager: He Peng Dianchi ONE.
▲ “Special joint for wire pipe+waterproof adhesive tape process” The wire pipe connection adopts a special matching joint connection.
The crack prevention process is embedded in the curtain box.
Hydropower Acceptance Stage Hu Shan Wang.
Hu Shan Wang · Hydropower Stage Designer: Yin Jun Area: 535 ㎡ Type: Villa Project Manager: Yin Jianming ▲ “Construction Level Standard Line” is the horizontal reference line for all decoration projects, and ensure that all switches are at the same height.
Openers must be used for opening ceramic tiles and stones, and the openings must be smooth.
Kitchen right angle testing Skirting line position flatness testing Ceiling flatness testing Rongchuang Cultural Tourism City · Mid term acceptance Designer: Li Xiaoyan Area: 138 ㎡ Type: Flat floor Project Manager: Li Bo ▲ “Le Huo Window Sill Grading Process” Ensure that the balcony and balcony are sealed with glass windows without water leakage and water flows outward.