What is the difference between the civil engineer of Party A and the construction worker of Party B?

7.

Responsible for on-site Q&A on civil engineering for bidding units.

Firstly, from the perspective of construction workers: construction workers are grassroots technical organization and management personnel.

4.

Construction workers are the specific practitioners of various organizational management tasks in construction enterprises at the grassroots level, and are the most grassroots technical and organizational management personnel who complete construction and installation tasks.

Participate in drawing review and design disclosure work, responsible for organizing, signing and distributing disclosure records.

8.

So, the goal of many construction workers from Party B is to one day join Party A and become a civil engineer for Party A.

5.

Responsible for coordinating work between the project construction site and various departments of Party A, participating in various on-site meetings, timely arranging on-site work, and implementing Party A’s requirements on site.

Review the material plan and usage of the construction unit and sign opinions.

Participate in civil engineering bidding and tendering work, and be responsible for cooperating with the budget department to prepare the base bid and bidding invitation.

6.

The design unit should actively cooperate with the construction, be responsible for explaining the design intent, explaining the design documents, promptly solving problems in the design documents during construction, responsible for design changes and budget modifications, and participating in the project completion acceptance.

Responsible for submitting the necessary materials for the design of this project and coordinating relevant matters during the design process.

Report the situation of the construction site to the leader in a timely manner, participate in meetings, and provide suggestions for the progress of the project.

They need to command and coordinate the relationships between grassroots professional management personnel such as budgeters, quality inspectors, safety officers, and material personnel.

Responsible for communication and coordination with project construction and supervision units, conscientiously implementing relevant contract terms, and supervising the work of the project department and supervision department of the construction unit.

In everyone’s opinion, the supervisor is at best here to make ends meet.

Participate in the review and evaluation of civil engineering bidding materials and documents, and provide reasonable suggestions.

3.

Participate in bidding and bid opening activities for materials and equipment related to this project, as well as bid opening activities for subcontracting projects.

The job of a construction worker is to specifically solve the relationship between construction organization design and the site at the construction site.

Responsible for reviewing monthly construction site reports and signing opinions on the allocation of monthly project progress payments.

Responsible for contacting, reviewing and confirming engineering design changes, carefully reviewing drawings, and promptly identifying problems during the construction process.

Many people say, what is the difference between a construction worker and a civil engineer from the first party? Should it be roughly similar? Isn’t it all done on-site? That sounds like a layman! So, what is the difference between the construction workers and the civil engineering engineers of Party A? Let’s take a look at the three main parties involved in the construction process: Party A, the construction party, and the supervision party.

At the same time, after reviewing the actual monthly material usage, the construction site shall report it to the Cost Department; Assist the quality inspection personnel of Party A with the arrival of materials, eliminate the use of “three no” products in engineering, and avoid waste and financial pressure.

② The constructor controls the construction production and progress of the project in charge, and is the information distribution center of the construction site of the unit.

The specific responsibilities are as follows: 1.

Assist the project manager in preparing for the start of the project.

2、 The unique position of the constructor determines the close relationship between him and the relevant departments, which is mainly reflected in the following aspects: ① The constructor and the construction supervision unit have the relationship between supervision and supervision and the construction unit, so the constructor should actively cooperate with the on-site supervisors in various works and inspections in construction quality control, construction progress control, and project investment control, Fully fulfill the engineering contract There is a working relationship between the construction personnel and the design unit.

Participate in completion acceptance and commissioning work.

The construction site representative shall reward and punish the construction site based on the implementation of the project, and in severe cases, work can be suspended.

The main job responsibilities include, under the leadership of the project manager, going deep into the construction site, assisting in construction supervision, reviewing the quantity of work with the construction team, providing the required material specifications, models, and arrival dates at the construction site, conducting on-site material acceptance and management, timely conducting acceptance and quantity certification for concealed works, and assisting the project manager in collecting, storing, and archiving project data, Responsible for the progress and cost of on-site construction.

5.

9.

Assist the Engineering Department Manager and Project Manager in the early operation of engineering projects.

Lifting Anchor

2.

Responsible for the visa of temporary workers on the construction site.

1、 Construction workers are the organizers and managers of the production line at the construction site, playing an extremely important role in the construction process, which is manifested in the following aspects: ① Construction workers are the management center of the unit project construction site, the embodiment of dynamic management of the construction site, the organizer of reasonable investment and optimization combination of production factors in the unit project, and have direct responsibility for the construction of the unit project.

③ The construction worker is the hub for external communication at the construction site in charge of the project Construction workers are the link that coordinates the relationships between grassroots professional management personnel, labor personnel, and other aspects of the construction site.

4.

6.

2.

Track and handle issues raised during drawing review.
.

10.

Responsibilities of Civil Engineering Management Position: 1.

The construction unit, design unit, and construction unit should negotiate and resolve the design changes and negotiations.

The contents of the organization design rely on the construction worker’s on-site supervision, measurement, writing of construction logs, reporting of construction progress, quality, and handling of on-site problems.

In our industry, people often think that the construction party is the most hardworking, while the first party is the most comfortable in nature.

At the same time, if the construction personnel discover unexpected new situations during the construction process, which have caused changes in the quantity, quality, and form of the project or any part of it, they should promptly report them to the higher authorities.

They are the liaison between the engineering command center and the construction team.

3.

So what about the civil construction workers of Party A? The civil engineer of Party A is a professional engineer appointed by Party A, who is fully responsible for supervising the construction organization, project quality, progress, and investment of the designated project, and keeping a good site log.