Temporary Traffic Control for the Construction of the North Head of Wanzhou Yangtze River Second Bridge! Broken roads, one-way traffic, and

Open temporary shuttle bus routes to and from Beishan Avenue, Qingjiang Ramp, Beibin Avenue Section 3, Wanwanzhong Ramp, Yangtze River Second Bridge, and Jiangnan New Area in Pipa Ping.

The direction of Section 3 of Beibin Avenue from Gulou No.5 intersection to Wanwanzhong ramp intersection is adjusted to three lanes, and a shared lane in the opposite direction is set up on the non riverside.

Gulou Fifth Road has been adjusted to one-way traffic from Beishan Avenue to the third section of Beibin Avenue.

We apologize for the inconvenience caused by the construction to the majority of traffic participants and kindly request your understanding and support.

Traffic police remind vehicles and pedestrians to consciously abide by traffic signs, markings, and other traffic signals on site, obey the instructions of relevant management personnel on site, and if there are violations, they will be punished in accordance with the law.

In order to ensure the smooth construction of the comprehensive transportation system project at the north bridgehead of the Yangtze River Second Bridge and the safety, order, and smoothness of road traffic during the construction period, in accordance with the relevant provisions of the Road Traffic Safety Law of the People’s Republic of China and with the consent of the Wanzhou District People’s Government, it has been decided that from 10:00 am on July 3, 2021, the construction of the Pipa Ping East Road (section from the Second Bridge to Ruishang City), Yangtze River Second Bridge, Xingfu Road, Gulou Fifth Road Temporary traffic control will be implemented on Beishan Avenue (Xingfu Road to Gulou Fifth Road) and Beibin Avenue Section 3 (Gulou Fifth Road to Wanwanzhong Ramp).

The downstream ramps of Pipaping East Road (Yangtze River Second Bridge to Ruishangcheng Road Section) and Section 3 from Second Bridge to Beibin Avenue will be fully closed, and vehicles and pedestrians are prohibited from passing through.

Information Release | Responsible Editor of Wanzhou Traffic Patrol Police | Da Feng
.

Parking is prohibited on all sections of Beibin Avenue, Xingfu Road, Changjiang Second Bridge, and Beishan Avenue.

Heavy and medium-sized trucks are prohibited from passing through Beishan Avenue, Xingfu Road, and Yangtze River Second Bridge every day from 7:00 to 9:00, and from 17:00 to 19:00.

The relevant matters are hereby announced as follows: (Click on the image to zoom in) 1.

The direction of Xingfu Road from the north bridgehead of Yangtze River Second Bridge to the intersection of Taojiaping and Beishan Avenue from the intersection of Taojiaping to the direction of Yudong Garden are one-way traffic for social vehicles; A bus lane is set up on Beishan Avenue from the intersection of Yudong Huayuan Road, Taojiaping Road, and Xingfu Road to the north end of Erqiao North Bridge.

From 6:00 to 22:00 every day, only buses and buses with 9 or more seats are allowed to pass, and other vehicles are prohibited from passing.

From 7:00 to 19:00 every day, in case heavy and medium-sized trucks (yellow license plate vehicles) are prohibited from passing on the ramp.

Flat Feed Anchor

Bus routes 18, 19, 22, 25, 31, and 32 in the 7th urban area will be diverted to and from Beishan Avenue and Xingfu Road.

Other vehicles are allowed to pass during other time periods.