What is the project of Party A, with the construction party involved in the work and the supervisor involved in the acceptance inspection?

In short, not being a good engineer and not being able to do PPT.

Prior to the last quarterly inspection, this engineer spent several consecutive days under the scorching July sun inspecting screw holes, from the roof to the basement, and discovered suspicions about life.

Is this really the case? Mingyuan Jun and some engineering personnel had a conversation, attempting to recreate the real daily work of the Party A engineers.

Shuttering Magnet

For example, when pouring concrete, some company’s first party engineers also need to stand by.

Some people say that construction sites are the “paradise” of real estate companies.

PPT building, meeting to catch up on progress.

Does Party A not need to go to the construction site? What kind of thing is it to do a project without the need for bricklaying and tiling? While the workers are working, there are still supervisors watching.

The first party has done the work of a supervisor or construction worker.

Perennially crawling and rolling on the construction site, Party A’s engineers have also developed a unique skill.

The engineer from Party A is really working on the project.

For him, 9:00 to 11:00 am is a high-load working time, mainly to transfer to the site to understand the progress and labor situation.

In fact, compared to Party B, the value of Party A’s engineers is more reflected in the organization and construction of standards
.

It is normal to be worried.

To make a disclosure, it is necessary to do a PPT; Make progress reports and do PPTs; To conduct inspection and summary, it is necessary to do PPT…

The emperor is far away, and there are labor teams working there, construction units in management, supervision parties for inspection and acceptance, and Party A’s engineers are like “Buddha statues”.

I was scared to death.

It is said that engineering workers hold the money from selling cabbage and worry about selling white flour.

Supervision and acceptance of major details, with Party A participating in the acceptance of key process contents.

The engineers of Party A are working on the construction site all day until 10:11 pm, what are they really busy with? A large part of the work of Party A’s engineers now involves filling in positions downwards.

In my first year on the construction site, during the Mid Autumn Festival, I caught up with the project and started pouring concrete, standing by all night.

They don’t need to build bricks and tiles, but can also enjoy the “worship” of suppliers.

People with acrophobia can easily flip over the outer frames of buildings in their twenties now; I used to spend half an hour shopping with my girlfriend and couldn’t walk, but now I can stand by for 24 hours; In the past, people used to take an elevator to go up and down the second floor, but now a 27 story building can slide up and down several times a day.

According to the above statement, there seems to be no significant difference between Party A and the supervisor, right? No, Party A can also use PPT to build a house and rely on meetings to catch up with the progress.

I hit and burst the tube, but I never saw such a scene at that time.

The project at hand can easily cost tens of billions, and if a detail goes wrong, it may result in losses of tens of thousands.

When encountering critical milestones, even if the supervisor is present, Party A’s engineers have to keep an eye on the site all night.