Weak current construction organization design plan (for project managers and design engineers to refer to)

The project content includes installation and equipment debugging.

We have determined one project leader to comprehensively coordinate all matters related to the project, and have the right to make decisions and veto all matters that occur within the scope of the project
.

It is necessary to carefully organize the construction, and closely cooperate with relevant units to ensure that the intelligent system has high safety, reliability, and stability, as well as the overall aesthetics, convenience, practicality, and maintenance of the equipment installation.

This weak current project involves network, telephone, monitoring, multimedia Indoor broadcasting.

Project Location and Scale: This project is located in *********, with a construction period of * * * year * * month * * day, completion date * * year * * month * * day, and a total construction period of * * * days.

Weak Current Construction Organization Design Plan Project Name: ********************** Construction Unit: ******************** Compilation Date: *********************** Date: ******************* Catalog Chapter 1 Project Overview and Construction Organization 1.1 Compilation Basis 1.2 Project Overview 1.2.1 Project Location and Scale 1.3 Construction Organization Structure Chapter 2 Construction Overall Deployment and Arrangement 2.1 Construction Preparation 2.2 Construction Preparation 2.2.1 Preparation Explanation 2.3.1 Construction Layout Preparation 2.3.2 Construction Electricity 2.3.3 Construction Water 2.4 Main Characteristics of the Project 2.5 Construction Steps and Methods 2.6 Key and Difficult Points and Key Process Description 2.6.1 Key and Difficult Points of the Project 2.6.2 Key Process Description 2.6 Construction Document Management 2.7 Construction Material Management Chapter 3 Main Tools and Equipment Plan 3.1 Installation Construction Main Tools and Equipment 3.2 Construction Measurement Instrument Allocation 3.3 Equipment Installation and Debugging Equipment Allocation Situation Chapter 4 Chapter 5 Construction Schedule Plan, Chapter 5 Material Supply Plan, 5.1 Construction Material Supply Plan, Chapter 6 Engineering Quality Assurance Measures, Chapter 7 Safety Construction Assurance Measures, Chapter 8 Construction Period Assurance Measures, Chapter 9 Civilized Construction Assurance Measures, Chapter 10 Environmental Protection and Energy Conservation Measures, Chapter 11 Cooperation with Professional Construction Units, Chapter 1 Engineering Overview and Construction Organization Overview.

This project has strict installation requirements and strong construction professionalism.

1.3 Construction Organization: Our company has established a dedicated project team for this project and implemented a project manager responsibility system.

Lifting Anchor