Due to subway construction, some sections around Joy City will be closed!

The traffic management department of Public Security said that during the construction period, it is expected that the road traffic pressure around the construction area will increase significantly, and more police will be deployed to increase the traffic guidance and control in the construction area, and remote diversion will be carried out by setting guide signs on key roads such as Nanjing Road and Yangtze River Road

.

Due to the fact that nanmenwai street is the main road in the central urban area, the residential area, business district and other resources along the line are concentrated, and the construction section is close to the prosperous commercial places, the daily traffic flow is relatively concentrated, the traffic pressure of the regional road will further increase during the construction period

.

At the same time, the traffic organization of several roads adjacent to the construction area has been adjusted

.

From the clothing street (West to east direction), all vehicles turn right to nanmenwai street; from Shenyi Street (East to west direction), all vehicles turn right to the new auxiliary road on the east side of nanmenwai street

.

In order to effectively guarantee the road traffic in the construction area and minimize the impact of construction on the road traffic, the public security traffic management department has made an overall traffic organization plan after full investigation and combined with the characteristics of regional traffic, that is, to build a new guide road by using the current road, to optimize and adjust the traffic organization of the surrounding road network on the basis of ensuring the two-way traffic in the construction section, and to alleviate the regional road traffic Pressure: first, new guide roads will be built on both sides of the construction section of nanmenwai street to provide two-way traffic for passing vehicles

.

It is understood that Gulou station is located in the south of the intersection of nanmenwai street and Nanma Road

.

The construction lasted 32 months and will occupy part of nanmenwai Street (Nanma Road to Shenyi Street section)

.

They must not forcibly merge roads or illegally park on the roadside

.

The majority of traffic participants are requested to understand the changes of road traffic, plan the travel time and route in advance, and the vehicles passing through the construction section should consciously abide by the relevant regulations

.

It is arranged in a north-south direction along nanmenwai street and is an island platform with three floors underground

.

Fourth, close the intersection of nanmenwai street and Yifu street

.

At the same time, according to the change of traffic flow, the traffic signal timing at the intersection of nanmenwai street and Nanma Road, and the intersection of nanmenwai street and Yifu street should be optimized to ensure the safety and order of road traffic

.

Part of the content is from today’s evening news.

.

Second, Nankai Second Road (the section from Yifu street to Nanma Road) will be adjusted to a north-south one-way road, and motor vehicles will be prohibited from passing from south to north

.

The vehicles passing through the construction section should consciously slow down according to the traffic police’s command and traffic signs (the speed limit of motor vehicles is 30 km / h), or bypass the South Road, Nankai Third Road, Nanjing Road and other roads

.

Thirdly, the clothing street (the section from nanmenwai street to nankaier Road) will be adjusted to a West to East single lane, and motor vehicles are prohibited to pass from east to West (except for motor vehicles entering the underground parking lot of Joy City)

.

People who drive to the mall should enter the underground parking lot of the mall in turn according to the instructions of the on-site staff

.

During the construction period, vehicles and pedestrians can pass through the new guide roads on both sides of the construction section

.

Jinyun news reporter Chai Ying learned from Tianjin public security traffic management department that due to the first phase construction of Gulou station of Metro Line 7, some sections of nanmenwai Street (South Road to Shenyi Street) were closed from 22:00 on February 3

.

The traffic management department of public security pointed out that as the construction section is close to the Joy City shopping mall and the traffic space of the new guide road is limited, people who go shopping in the shopping mall should try their best to take public transportation such as bus or subway

.

The majority of traffic participants are requested to plan the travel time and route in advance

.