2、 The construction site is Xinhe checkpoint for epidemic prevention and control in Mengyong town (National Highway 323k2807 + 950m).
It is suggested that during the construction period, the masses should reasonably arrange the travel route and drive around as much as possible.
Please cooperate with the epidemic inspection, pay attention to driving safety, and ensure smooth, orderly and safe passage through the checkpoint.
People’s Government of Mengyong Town, Gengma Dai and Wa Autonomous County, January 10, 2022..
We need to rebuild and control the new epidemic prevention and control points of the epidemic prevention and control in Meng Yong Town.
Please understand that the construction and transformation of new epidemic prevention and control points have brought inconvenience to the travel of the masses.
It is hereby notified.
4、 Relevant requirements (I) reasonably arrange the itinerary.
Construction time: 14:00, January 11, 2022 – 24:00, January 14, 2022.
(2) Cooperate with the traffic control on the construction site.
3、 Traffic control measures during construction, traffic control measures of one-way release every 25 minutes shall be taken.
(3) Pay attention to driving safety.
Clicking on the blue word concerns me to further strengthen the prevention and control of the epidemic situation of New Coronavirus infection and effectively protect the health and safety of the people.
Vehicles and pedestrians who need to pass through this section must pass according to the traffic tips and instructions on the construction site, and consciously obey the command and dispatching of on-site staff.