The Ministry of housing and urban rural development issued the guidelines for the preparation of special construction schemes for “dangerous

(6) Construction management, staffing and division of labor 1 Construction management personnel: list of management personnel and post responsibilities (such as project leader, project technical leader, constructor, quality officer, team leaders, etc.).

Professional knowledge of infrastructure engineering machinery < < knowledgeschool > > building curtain wall installation project (I) project overview 1 issued by the Ministry of housing and urban rural development guidance for the preparation of special construction scheme of “dangerous and large projects” Overview and characteristics of building curtain wall installation project: overview of the project and building curtain wall installation project, type and division area of curtain wall system, installation height of curtain wall, shape of curtain wall, size and weight of curtain wall materials, installation conditions provided by the general contractor, dangerous contents of curtain wall project, etc.

(8) Emergency response measures 1 Composition and responsibilities of emergency response leading group, composition and responsibilities of emergency rescue group, including rescue, security, logistics, medical rescue, aftermath, emergency rescue workflow, response measures, contact information, etc.

2.

Responsible entities of all parties involved in the construction.

Formwork Cone

Inspection requirements: mobilization quality inspection of materials used in curtain wall works, stage inspection items and contents.

3.

Process flow: transportation of curtain wall materials and components, installation, use and removal of installation facilities.

2.

Monitoring measures: monitoring content, monitoring method, monitoring frequency, name, model and accuracy grade of monitoring instruments and equipment, alarm value of monitoring items, patrol inspection, information feedback, layout plan of monitoring points, etc.

Construction plane and elevation layout: the general construction plane layout of the project, including curtain wall engineering plan, elevation, section, typical node drawing, etc.

4.

Acceptance contents: specifications and models of mobilized materials and components, structural requirements, assembly quality, wall connecting parts and attached support structures, anti overturning, anti falling, load control system, power system and other devices.

2.

Project documents: construction contract (construction contracting mode), survey documents, construction drawings, etc.

(9) Calculation sheet and relevant construction drawings 1 Calculation sheet of curtain wall engineering: calculation basis, calculation parameters, calculation diagram, control indicators, checking calculation of bearing capacity of components, foundations and attached supports of curtain wall installation and operation facilities and transportation equipment, calculation of rigging, slings and power equipment, etc.

3.

2.

Labor plan.

Construction method and operation requirements: construction preparation, erection method, structural measures (such as cross bracing, peripheral tie, etc.) before the erection of curtain wall installation and operation facilities, setting of safety devices (such as anti overturning, anti falling, safety lock, etc.), safety protection setting, demolition method, etc.

Overview of surrounding structures of curtain wall project and climatic characteristics and seasonal weather of construction site.

(7) Acceptance requirements 1 Acceptance criteria: prepare acceptance criteria and acceptance conditions according to the design and requirements of temporary facilities for curtain wall installation.

Emergency events (major hidden dangers and accidents) and their emergency measures.

(4) Construction technology 1 Technical parameters: selection of curtain wall type, installation and operation facilities, design of foundation, frame, wall attached support and wall connecting parts, selection and design parameters of power equipment.

Emergency material preparation.

Special operation personnel: list of licensed personnel and post responsibilities for curtain wall installation and operation facilities.

Relevant design drawings: layout plan and section drawing of curtain wall installation and operation facilities and transportation equipment, safety protection design and construction drawing, node details of foundation, embedded anchorage, attached support, special parts and special structures, stacking plan and detail drawing of curtain wall components, curtain wall hoisting operation route and transportation route, etc.

Technical measures: safety assurance measures, quality and technical assurance measures, civilized construction assurance measures, environmental protection measures, seasonal construction assurance measures, etc.

2.

In the last issue, the Ministry of housing and urban rural development issued the guide for the preparation of special construction scheme for “dangerous and large projects”, which is the whole process teaching of climbing frame installation and lifting process of concealed excavation engineering! Guangzhou Jinmai Technology Equipment Co., Ltd.

3.

Material and equipment plan: specification, model, quantity and mobilization and demobilization schedule of materials and equipment for curtain wall works and temporary facilities for curtain wall construction.

Construction organization design, etc.

3.

4.

2.

on which the curtain wall installation works are based.

(3) Construction plan 1 Construction schedule: overall construction sequence and progress of curtain wall project, introduction of construction measures of each curtain wall, construction sequence and progress.

(2) Preparation basis 1 Legal basis: relevant laws, regulations, normative documents, standards, specifications, etc.

Construction requirements: specify the quality and safety objectives and requirements, construction period requirements (commencement date and planned completion date of the project), start and completion date of curtain wall project.

2.

3.

2.

was founded for 10 years and headquartered in Zhujiang New Town, CBD, Guangzhou.

3.

Information of rescue hospital (name, telephone, rescue line).

4.

3.

Risk identification and classification: risk identification and safety risk classification of curtain wall engineering.

Adhering to the core values of “practical service, quality, service, innovation and sharing”, Guangzhou Jinmai Technology Equipment Co., Ltd.

4.

Other operators: list of other personnel and post responsibilities.

Full time safety personnel: list of full-time safety production management personnel and post responsibilities.

Acceptance procedures and personnel: determine the curtain wall installation acceptance stage, acceptance items and acceptance personnel (relevant principals of construction, construction, supervision, monitoring and other units) according to the design requirements and use requirements of temporary facilities for curtain wall installation.

3.

(5) Construction assurance measures 1 Organizational guarantee measures: safety organization, safety assurance system and safety responsibilities of corresponding personnel, etc.

always adheres to creating value for cooperative customers, industries and countries, and cooperates with XCMG group, Zoomlion, CSCEC technology, China railway construction, China Railway, country garden Evergrande and other 40 + state-owned enterprises, central enterprises and well-known enterprises have reached long-term strategic cooperation alliances, have a large number of infrastructure and real estate cooperation projects, and rank first in the industry with huge scale and qualification..