Should the ground be cleaned after each grinding during the construction of solidified floor?

If the ground is not cleaned in time after grinding, the grinding disc will be consumed in the next grinding process and the construction cost will be increased.

So why? 1.

To sum up, in order to make a better ground.

If the mud and dust on the ground are not cleaned up, it will affect the penetration of materials and ultimately the effect of the ground.

If the ground is not cleaned in time, it is easy to grind the ground in the process of grinding the next type of grinding disc, that is, there will be circle after circle of scratches.

The size of particles polished by different types of grinding discs is different.

2.

Click the blue words above to pay attention to our ~ curing floor construction, which needs to be polished for several times, from coarse grinding to fine grinding and then to polishing.

RECOMM.

Magnetic Steel Chamfer

In the rough grinding stage, it is necessary to sprinkle curing agent materials after each grinding.

3.

Whether it is rough grinding, fine grinding, or even polishing, after the grinding of each type of resin grinding plate, we emphasize that the ground must be cleaned before the next construction operation.

In the construction of solidified floor, the construction process provided by the manufacturer shall be followed, and the ground shall be cleaned in time after each grinding.