What is the difference between drainage board and storage drainage board; Construction requirements for drainage board

(William Shakespeare, Windsor, barbed wire, barbed wire, cement, barbed wire, concrete) 5 Pay attention to laying the drainage board in any area, and do not introduce the garbage such as soil, cement and sand storm into the front space of the drainage board.

Click here to enter Official Website Telephone No.

When the drainage board is paved, 1-2 fulcrums are overlapped between the edge and the right side, or the two bottom plates are connected.

The installation quality of drainage board shall be prevented from being affected by strong wind.

Our company specializes in producing long (short) thread geotextile, grass cloth, ecological bag, geomembrane, composite geomembrane, PE/PVC/EVA/ECB waterproof board, GCL sodium bentonite waterproof blanket, compound drainage network, drainage board, geogrid, closed cell foam board, geocell, geotechnical network, rubber water stop, Flood control sandbags, flood control woven bags..

The soil itself is easy to loosen and filter water.

Pile a wall outside the drainage board, or protect the drainage board with wire mesh powder cement, so that the water leakage board space outside the wall directly flows into the square ditch to form a sump.

The soil is overlapped to keep the soil from entering the ditch of the drainage board and drain smoothly.

The impermeable water at the bottom of the basement is provided with an overhead pad on the foundation.

Click here to enter Official Website Telephone No.

  8.

Installer: 1 Clean up the garbage on the packaging site and level the cement to ensure that there is no obvious concave convex on the site.

  6.

15688801388 official telephone number [WeChat 15688801388].

It is ideal to pave 3-5cm sand storm on the earthwork cloth with clay for backfilling, which is conducive to the filtering water of the earthwork cloth.

  4.

  7.

If the drainage board is used to replace the pebble filter layer for drainage, it can save time, effort, energy, investment and reduce the load of the building.

If the white pen is nutritious soil or light soil, there is no need to lay another layer of dust storm.

  2.

In the traditional drainage method, stone tiles are used as the induction layer, and more crushed stones or crushed stones are used as the filter layer to discharge the water to the designated place.

Under the circular stone platform, ridges and strips shall be left everywhere to prevent underground water from flowing into the surrounding ridges and strips naturally through the space of the drainage plate and into the sump through the ridges and strips.

  3.

Confirm whether the space of the drainage board is unblocked.

The basement and inner wall waterproof shall be protected as soon as possible to prevent the drainage board from being damaged by people or objects.

When installing the drainage board, protective measures shall be taken as far as possible, the floor or outdoor garage shall be paved, the drainage board shall be paved, and the backfilling shall be done as soon as possible.

The drainage board can concentrate the water discharged from the drainage board to the nearby sewer or the nearby urban sewer.

The basement wall penetrates water, the main wall of the building is paved with drainage boards, and the circular stone column faces the main wall.

The top surface of the conical stone column filters a layer of earthwork cloth to prevent the passage of soil particles and the blockage of ditches, so as to prevent the smooth drainage of holes.

Our company specializes in producing long (short) thread geotextile, grass cloth, ecological bag, geomembrane, composite geomembrane, PE/PVC/EVA/ECB waterproof board, GCL sodium bentonite waterproof blanket, compound drainage network, drainage board, geogrid, closed cell foam board, geocell, geotechnical network, rubber water stop, Flood control sandbags, flood control woven bags and drainage boards are stamped with hips (polystyrene) or polyethylene plastic bottom plates to form conical stone columns (or hollow cylindrical holes).

2-5 slopes are required for the roof of the outdoor garage and the roof garden.

In other words, before making the base plate, the drainage plate shall be made first.

Spread Anchor

15688801388 official telephone number [WeChat 15688801388].