30 effective measures to reduce engineering construction cost

It is required to control expenditure with budget income, conduct cost accounting and formulate target cost.

12.

Reasonably arrange earthwork excavation procedures.

During construction, materials shall be received in limited quantity and used reasonably to reduce the loss of materials.

If granite is purchased, the base metal must be selected from the mine.

Strengthen the dispatch and management of labor force.

Remember these ten items..

Bulk cement is adopted to save packaging cost.

22.

26.

Fully grasp the joint review of drawings, combine the design scheme with reality, reduce the cost and facilitate the construction.

Implement cost veto.

Reduce material procurement cost.

Reduce the cost of raw materials~~ Malicious arrears of wages of 126 migrant workers, the boss of a construction labor company in Jiangxi was sentenced to save so much money by controlling costs? Have you learned how to make people? It’s not difficult to do a budget, but it’s not easy to do a good budget.

On the premise of ensuring safety, reducing the earthwork grading of foundation trench can reduce the earthwork volume, so as to save labor cost and machine shift cost.

18.

4.

During the construction process, the project department shall ensure the effective operation of the quality system according to the requirements of the company’s quality manual and procedure documents, strictly control all quality inspections, strengthen supervision and inspection on key parts such as toilets and concealed works, eliminate potential quality hazards in the bud and avoid the loss of rectification and rework caused by quality problems.

16.

Carry out cost back calculation according to the target cost, and determine the control range of material consumption of each divisional and subdivisional project and the control range of each type of work.

7.

The project department shall timely prepare the divisional construction schedule of installation works according to the general schedule of the project, make full use of cross construction, flow operation and other means, scientifically arrange and strictly implement various elements of construction, reduce idling, shutdown and other phenomena, and improve labor productivity.

Do a good job in material measurement, clean up, reasonably recycle and reduce raw material consumption.

25.

Earnestly implement various quality systems.

After the completion of the project, the project settlement data shall be taken out as soon as possible, so as to achieve the completion of work, site clearing and account clearing, so as to reflect the benefits of the enterprise in time, ensure the normal return of funds, speed up the turnover of funds and reduce financial costs.

For the installation project, in the early stage of the project, the construction cooperation period is long, the labor consumption is large, and in the later stage, the quantities are concentrated, the construction period is tight and the pressure is high.

20.

21.

Improve the plan management level, grasp the plan preparation, comprehensively balance and check the implementation links.

Pay attention to the completion and delivery of the project to ensure that the benefits can be brought into play as soon as possible.

Strictly open the template to reduce rework and cost.

Early strength agent shall be added to the concrete to shorten the formwork erection time and speed up the formwork turnover.

15.

23.

Strengthen contract management and reduce contract risks.

24.

Lifting Anchor

Allocate earthwork excavation and backfilling to save project cost.

28.

Prepare scientific and reasonable construction plan.

19.

Strengthen the management, maintenance and repair of mechanical equipment and improve the utilization rate of machinery.

The labor force shall be allocated according to the needs of the project progress, a more thorough responsibility contracting method shall be adopted for the construction team, the salary distribution shall be linked with the completed project, and one specialty and multiple abilities shall be advocated to reduce intermittent idling and non production employment.

Strengthen the control and management of process product quality, ensure that the products are excellent at one time, reduce rework and other phenomena, ensure the progress with quality and reduce the cost with quality.

13.

Strengthen production management and solve practical problems in the construction process in time to speed up the construction progress.

Select advanced and reasonable construction technology and methods, make full use of the construction site, expand the mixing working face, improve the mixing processing efficiency and reduce the project cost.

Strengthen project cost management, prepare project cost control plan, increase revenue and reduce expenditure, conduct cost analysis regularly, and take measures to reduce expenses and increase profits.

6.

Construction machines and tools shall be equipped reasonably, and construction machinery with high efficiency shall be selected to improve productivity and mechanized construction level.

After cutting, the plates shall be arranged at the place of origin and transported to the construction site after passing the acceptance.

Strengthen the site general layout management, and stack the mobilized materials, finished products and semi-finished products according to the site layout, so as to be reasonable and tidy, so as to reduce the secondary handling loss.

9.

5.

3.

Reasonably organize construction.

In the construction arrangement, corresponding measures should be taken as soon as possible, so as to cooperate and process while there are installation conditions, and pay close attention to the construction when there are installation conditions, so as to disperse the workload in the peak construction period, reduce the pressure on the installation work in the later stage of the project and achieve balanced construction.

The use of double mixing technology in concrete can not only reduce the cost, but also improve the workability of concrete (mortar) and improve the quality of concrete.

2.

30.

Strengthen formwork management, do a good job in formwork removal and maintenance, and increase the turnover times.

29.

17.

1.

27.

During the construction process, actively promote new construction methods and means such as new processes, new materials and new machines and tools, so as to improve construction efficiency, reduce project cost, pay attention to technical innovation and rationalization suggestions, so as to ensure the realization of project quality, progress and cost objectives.

The materials and equipment entering the site shall be stacked in the open air to reduce the time, prevent the loss of natural loss and reduce the storage cost.

On the premise of meeting the construction progress, the project department shall scientifically prepare monthly and quarterly material requisition plans; Strengthen the on-site material management, ensure that the material plan is accurate, and organize the materials of different varieties and specifications to enter the site in batches according to the needs of the project progress.

10.

Grasp all links of material handling, transportation and management to reduce material consumption.

Do a good job in the mobilization acceptance of materials, inspect the quality and quantity, and reduce the mobilization loss.

For the procurement of materials and equipment, compare three suppliers, finally determine the supplier, and strive for the direct supply of batch materials by the manufacturer, so as to reduce the intermediate circulation links and reduce the cost of material procurement.

14.

11.

Try to complete the quality acceptance at the place of origin of raw materials or semi-finished products to reduce the scrap rate of materials.

8.