The construction of several projects in Wenchang fengjiawan Industrial Park has been accelerated. Modern plants have sprung up and efficient

January 20 coincides with the end of the twenty-four solar terms – great cold.

At the end of the year, shops selling Spring Festival couplets and lanterns on the streets of Huiwen Town, Wenchang City have set off the atmosphere of the new year.

On the construction site where people come and go, the four plants with giant reinforced roofs of Kuncheng aquatic products project are particularly eye-catching.

Roll up your sleeves and come on!” Wu Hefei longed.

During the conversation, a three or four year old boy suddenly appeared and shouted “Grandpa” at Wu Hefei.

Hainan Daily reporter Li Jiafei photographed that under the giant roof, the White Sea capacity module building materials bite each other one by one through the hands of workers, stacking the walls layer by layer to connect with the roof.

The workers will celebrate the new year on the construction site!” Jin Zhen, a staff member of the Industrial Park Management Committee, pointed to the busy construction site while walking, “this is jingsan Road, that is Weier Road, which has just been opened to traffic two days ago…” along the direction of her finger, the reporter of Hainan Daily saw that two sections of concrete pavement have been opened to traffic.

Some are good at incubating shrimp seedlings, and some focus on cultivating East Star spot.

On January 20, the construction site of Kuncheng aquatic product project in fengjiawan Industrial Park, Wenchang.

“Fengjiawan is very suitable for the development of aquaculture in terms of climate, environment and industrial foundation.

The first phase of the project is expected to be put into operation in July this year.

Looking at the child’s tender face, Wu Hefei smiled happily and promised him to go home for reunion on New Year’s Eve.

The fengjiawan modern fishery industrial park not far away is a construction scene in full swing.

“This is a new type of environmental protection material, which has the effects of heat preservation and insulation, is conducive to the growth of fish fry, and it can protect the inner core of reinforcement, which is solid and durable.” Wu Hefei said that the modern farm will adopt high-density breeding, and the yield of East Star spot will be increased by more than three times in the breeding area with the same floor area.

“This Spring Festival, there will be no holiday for the construction of infrastructure projects in the park.

From the construction signs, you can see the words “Bohai aquatic products”, “blue ocean aquatic products” and “Kuncheng aquatic products”.

Therefore, we are full of confidence in the future.

They are all leaders in the aquaculture industry.

“What you saw when you came over a month ago is not what it is now?” He said with a smile.

The built module is interspersed with reinforcement and then poured with concrete.

According to the plan, Kuncheng aquaculture project will build 8 industrial circulating water aquaculture demonstration workshops, 3 mariculture breeding workshops, 1 mariculture product processing and cold chain distribution center, a tail water treatment center covering an area of about 5 mu, an industrial aquaculture (Hainan) Innovation Research Institute and a circulating water treatment equipment manufacturing center.

In order to speed up the construction period, more than 20 workers on the construction site have worked overtime in recent days.

In the year of the tiger, the tiger is powerful.

Trucks and trucks shuttle between them, and modern factories rise from the ground.

Hainan Daily reporter walked into the construction site, and Wu Hefei, the person in charge of the construction unit, immediately came up wearing a helmet.

It turned out that Wu Hefei had not returned home for many days, and his little grandson went to the construction site to find him.

Crown Foot Anchor

Source: Hainan Daily reporter Li Jiafei note: this picture was published by Wenchang editor,.

Distributed along the road are enterprises settled in the park.

Standing on the built roof overlooking, there are many busy construction sites like Kuncheng aquatic products project in the whole industrial park.