Related problems of safety technical disclosure on construction site

During the construction period, the disclosure shall be kept for reference.

Article 27 of the regulations on the administration of work safety of construction projects (Order No.

The significance of safety technical disclosure can be clearly understood in the description of article 4.1.5.

Article description: 4 installation of construction elevator 4.1.5 the purpose of safety technical disclosure is to make each installation operator clear about the operation contents, parts and requirements, the use of relevant tools and equipment and any safety regulations emphasized in the special construction scheme of installation project.

Parts or links that may cause fire during construction.

for the specific workplace or process with fire risk.

The safety technical disclosure in this standard is the person in charge of construction, in which the full-time safety management personnel appear in the signature, which can be understood as that the safety personnel should participate in the disclosure meeting, but not the person in charge of disclosure.

2、 Jgj202-20107.0.6 technical code for safety of construction tool scaffolds jgj202-20107.0.6 the use of tool scaffolds on the construction site shall be uniformly supervised by the general contractor and shall comply with the following provisions: 1.

Today, let’s talk about whether the safety technical disclosure at the construction site is the disclosure of safety personnel or technicians (this problem is written in many projects, including the disclosure sheet of safety personnel and technicians), the old rules, check the relevant specifications and standards, and start…

Fire fighting methods and precautions for initial fire.

Safety disclosure, technical disclosure and safety technical disclosure have different meanings.

393 of the State Council)   before the construction of construction projects, the technicians in charge of project management of the construction unit shall make a detailed description of the technical requirements related to safe construction to the construction teams and operators, which shall be signed and confirmed by both parties.

In this specification, the safety technical disclosure shall be carried out by the construction management personnel on the construction site.

3、 Jgj215-20104.1.5 before installation, the installation technician shall make safety technical disclosure to the installation operator according to the requirements of the special construction scheme and operation manual for the installation and disassembly of construction elevator, which shall be signed by the installation operator.

Escape method and route.

All specifications and standards with the words of safety technical disclosure, It shall be handled according to the year of promulgation and Implementation: I.

5、 Technical code for fire safety at construction site of construction engineering gb50720-20116.1.8 before construction, the construction management personnel at the construction site shall make technical disclosure on fire safety to the operators.

In this specification, the general contractor shall carry out safety education for operators and supervise the safety technical disclosure to operators.

Therefore, it can be seen that the disclosure should be self-organized by professional subcontractors.

The supervision unit shall ensure that after the disclosure meeting, all relevant operators sign a disclosure report to prove that they have participated in the disclosure meeting.

2 fire prevention measures to be taken during construction and temporary fire-fighting facilities to be equipped.

3.

The disclosure in this article means that the technical personnel of the professional subcontractor shall make safety technical disclosure to all installation personnel and sign.

The six words of safety technical disclosure are not clearly written in the regulations, but it can be clear from the content that the safety technical disclosure shall be implemented by the technical director of the project.

The technical disclosure of fire safety shall include the following main contents: 1.

Safety education shall be given to relevant operators before installation, lifting, use and demolition; And supervise the safety technical disclosure to operators.

4.

This is consistent with the provisions of Section 10.2 of the regulations on the safe use of construction elevators in the UK 2006: before the installation operation, the installation operators of construction elevators should ensure that they have a clear understanding of the construction scheme of installation works given by the installation unit.

Socket Data Clip

In addition, by participating in the disclosure meeting before the installation of construction elevator, the installation personnel of construction elevator shall be familiar with the installation work to be carried out, improve safety awareness and reduce the risk caused by negligence.

This is the same as the disclosure meaning in the safety technical code for construction tool scaffold.

At present, some provisions of the code are also being revised..

4、 Standard for safety inspection of building construction jgj59-20113 safety technical disclosure 1) when assigning production tasks, the person in charge of construction shall make written safety technical disclosure to relevant management personnel and construction operators; 2) The safety technical disclosure shall be carried out according to the construction process, construction position and construction building number; 3) The safety technical disclosure shall disclose the dangerous factors, construction scheme, specifications and standards, operating procedures and emergency measures in combination with the conditions, characteristics and processes of the construction site; 4) The safety technical disclosure shall be signed and confirmed by the Discloser, the discloser and the full-time safety officer.

Since the implementation time of this industry standard is 2010, the technical specification is currently under revision and will not be discussed in detail.

The disclosure shall teach the operators the knowledge and skills of how to prevent fire, extinguish the initial fire, self rescue and escape, etc.

Fire safety technical disclosure is a part of safety technical disclosure, which can be carried out together with safety technical disclosure or separately.

The safety technical disclosure mainly includes three aspects: first, the disclosure shall be carried out by parts and items according to the project parts; Second, for the types of work with relatively fixed construction operations and not directly related to the construction parts of the project, such as hoisting machinery and reinforcement processing, separate disclosure shall be made; Third, the management personnel at all levels of the project shall be disclosed with the safety construction scheme as the main content.

These reports shall remain on the site at all times during the construction period.

Article description: 6.1.8 the object of fire safety technical disclosure is personnel working in places with fire hazards or personnel implementing processes with fire hazards.