[safety lecture] water construction

In order to ensure the safety of water hoisting operation of prefabricated bottom casing, after full consideration and preparation in the early stage of the project, the way of “prefabrication on board, on-site hoisting and strengthening monitoring and measurement” is finally adopted to ensure construction safety and speed up the construction speed.

8 main pier in the water has been completed.

8 main pier is in full swing.

Let’s take a look at the relevant regulations involved in the process of water construction.

The structural form of the main bridge is an 8-span suspended cast-in-place rigid frame continuous beam bridge with a maximum span of 200m.

Click the blue word above to learn more about the project! The total length of the water part of the salibas bridge project is 1230m.

The project department shall keep in touch with the local meteorological department, SRB River Administration and other departments at any time, listen to and record the meteorological forecast data in advance, timely grasp the weather changes and tidal dynamics, be confident and adjust the construction rhythm in time.

2.

At present, the binding of reinforcement of bearing platform of No.

The river crossing is completed through 7 underwater bearing platforms.

Up to now, the construction of prefabricated bottom casing of No.

Based on the safety inspection standards of the local river authority, all kinds of ships participating in the construction on the construction site (including traffic ships and transport ships cooperating with the construction operation) must also meet the relevant safety requirements, implement the safety regulations, and the man-machine materials must hold various valid certificates.

I.

The bearing platform is a high pile bearing platform in the form of underwater pile groups, and the pile foundation is an ultra long and large-diameter driven steel pipe friction pile, Inclined piles account for more than 85%.

Among them, ship machinery, communication, fire fighting, life-saving, anti pollution and other equipment must be safe and effective, regularly inspected and tested, and handled in time in case of abnormalities.

Lifting Anchor

Slide left.

General Provisions for water construction 1.