Gaoming 2 road closure construction! It’s about Yunyong highway

Notice 1 due to the construction needs of Yunyong highway, It is hereby planned to carry out the road closure construction at the intersection of Hehe Avenue and mingba Road (Gaoming Avenue s272k45 + 900-s272k46 + 100) from March 1, 2022 to May 20, 2022.

During the road closure period, all passing vehicles need to travel according to the instructions of the guide board at the intersection of Hehe Avenue and mingba Road (Gaoming Avenue s272k45 + 900-s272k46 + 100) and at the intersection of Gaoming Avenue and Guangming Expressway (hehe Avenue hhk0 + 950-hhk1 + 450).

Due to the construction of Yunyong highway, the following two roads need to be closed.

Fixing Socket Cross Hole

Source: Yunyong highway project management department of China Railway 14th bureau group, Mingcheng Town People’s government, Gaoming release, etc..

During the road closure period, all passing vehicles shall drive according to the instructions of the guide board, Please understand the inconvenience caused to travelers! It is reported on February 28, 2022 that the Yunyong highway project management department of China Railway 14th Bureau Group is located in Mingcheng Town, connecting Mingcheng exit of Guangming Expressway in the north and Miao village of yanggeng line in the south, with a total length of 12.95 kilometers, including 2.3 kilometers of new section, 10.65 kilometers of reconstruction and expansion section, 15.5 meters of subgrade width, two-way 4-lane design and class II highway technical standards.

The whole line is equipped with one bridge, three medium bridges and 36 culverts, with a total investment of 946 million yuan.

During the road closure period, all passing vehicles need to drive according to the instructions of the guide board.

Please understand the inconvenience caused to the travelers! The construction project management department of Yunyong highway project of China Railway 14th Bureau Group announced on February 28, 2022 that due to the needs of Yunyong highway construction, it is planned to carry out road closure construction at the intersection of Gaoming Avenue and Guangming Expressway (hehe Avenue hhk0 + 950-hhk1 + 450) from March 1, 2022 to May 30, 2022.

Different from ordinary roads, a series of greening landscapes are planned on both sides of YUNYONG Road, which is also equipped with tourist scenic roads, greenway system, special riding roads, traffic post stations and other public leisure facilities.