Simplified version of the latest construction safety contract in 2022

♩..

♩~♫.

♩..

8.

2、 Party B’s safety responsibility 1.

♩~♫.

♩~♫.

♪..

♩♫.

♪~♬..

♪~♬..

♩..

♩~♫.

♩~♫.

♩~♫.

♩..

♪~♬..

♩..

We recommend a selection of beautiful articles to our friends every day, hoping to bring you a ray of peace after work.

♪~♬..

Matters not covered herein shall be settled by both parties through negotiation.

♩~♫.

♪~♬..

♩ Daily reading Study to nourish one’s nature.

♩..

♩~♫.

Party A: Party B: mm / DD / yyyy ♪~♬..

Party A shall not imply or express that Party B uses mechanical equipment and facilities that do not meet the requirements of safety regulations.

In case of potential safety hazards, Party B shall eliminate them in time.

♩♫.

In case of unpredictable or natural disasters during construction, Party B shall be responsible for the emergency rescue and treatment of the site, protect the site and immediately start the emergency plan.

If Party A’s normal production is affected due to Party B’s serious illegal construction operations, Party B has the right to stop its construction operations until it passes the rectification and acceptance.

♩~♫.

If Party B fails to operate in accordance with the safety management systems proposed by Party A, Party A has the right to terminate the contract.

The agreement shall come into force on the date of signature, and the agreement shall be terminated upon the termination of the project.

4.

7.

♩..

5.

♩~♫.

♪..

♪~♬..

3.

Supervise and inspect the safe construction and operation of Party B, and impose penalties for violations of laws and disciplines in accordance with the detailed rules for safety inspection and assessment of Party A.

♪..

Before entering the site for construction, disclose safety matters to the project leader of Party B.

2.

Cast In Loop

♪~♬..

III.

During the construction, Party B shall be fully responsible for the accidents caused by Party B’s improper operation.

♪~♬..

♩~♫.

♩~♫.

Party B shall ensure to carry out safety activities and safety inspection for employees on a regular basis.

♩~♫.

Party A shall not put forward requirements that do not meet the safety production laws and regulations of construction projects to the survey, design, construction, engineering supervision and other units engaged in construction activities.

♪~♬..

♩~♫.

♪~♬..

6.

♩..

♪~♬..

♪~♬..

the contract is made in duplicate, with each party holding one copy.

Party A’s safety responsibility 1.

♪~♬..

3.

♩~♫.

♩~♫.

♪~♬..

Click the blue word to pay attention to us in case of emergency ~ safety contract Party A: Party B: Project: in order to strengthen the sense of cooperation and clarify the responsibility, the potential safety hazards are eliminated in the bud with the purpose of “safety first and prevention first” After negotiation between Party A and Party B, the following contracts are signed: 1.

4.

Party A has the right to stop Party B’s illegal command and operation.

Party B’s special operation personnel shall do a good job in safety work in accordance with the management system for special operation personnel with certificates.

Share the ball and praise the ball..

♪..

♩♫.

2.

Party B shall do a good job in the safety protection equipment of the type of work on site.

Party B shall do well in all safety work according to the safety management system on construction site.

♪~♬..