Selected topics of 2022 second construction project construction management (4)

project construction supervision outline C.

Backhoe excavator with bucket capacity of 1m3, excavate three types of soil, load the truck, and the excavation depth is within 2m.

project technical director correct answer: B.

– 18 C.

project manager B.

8.

The total contract price is not determined at one time, After the construction drawing design of a certain part is completed, the construction bidding of this part of the project shall be carried out to determine the contract price of this part of the project, and the determination of subcontracting and material suppliers all need bidding.

Wei Lang education arranges 10 real questions for you over the years, with answer analysis for your self-test and improvement before the exam! 1.

A total price can also be determined without determining the total construction and installation cost in advance.

3.

[single choice] a.

The content and format of its preparation are basically the same as the requirements of procedure documents.

answer analysis: detailed rules for the implementation of supervision shall be prepared for projects with new materials, new processes, new technologies and new equipment, as well as divisional and subdivisional projects with strong professionalism and high risk.

The demonstration of the overall progress objectives of the construction project includes: ① dividing the project structure; ② Investigation and data collection; ③ Prepare the schedule of each layer; ④ Coordinate the relationship between the progress plans of all levels and prepare the general progress plan; ⑤ Determine the work code of the project, and its correct work steps are ().

detailed rules for the implementation of project construction supervision D.

technical standards; C.

all subcontracts and sub supply contracts are determined by the general contracting management unit without bidding quotation.

9.

According to the construction contract of an underground project, the planned excavation earthwork in March is 40000m3, including the same unit price of 90 yuan /m3: the actual development earthwork in March is 38000m3, and the actual unit price is 80 yuan /m3, then by the end of March, the progress deviation of the project is () yuan.

project leader of the construction unit D.

performance report correct answer: A, B, C, D.

engineering archives management system; correct answer: A.

[single choice] A.

For engineering projects using new materials, new processes and new equipment, the project supervision organization undertaking its supervision business shall prepare () in addition to the project construction supervision plan.

management regulations E.

① – ③ – ④ – ② – ⑤ B.

answer analysis: the construction survey review must be carried out carefully during the construction process, and the review results should be submitted to the supervision engineer for re inspection and confirmation before the construction of subsequent relevant processes can be carried out.

Correct answer: C.

answer analysis: operation documents refer to documents other than management manuals and procedure documents, generally including operation instructions (operating procedures), management regulations, monitoring activity guidelines and forms referenced in procedure documents.

7.

① – ④ – ② – ⑤ – ③ C.

② – ③ – ① – ④ – ⑤ D.

The correct statement about the contract price of construction general contracting management is ().

[single choice] A.

B.

The construction unit must carefully review the construction survey and submit the review results to () for re inspection and confirmation.

the general contracting management contract price shall be calculated according to the rate after the total construction and installation cost is determined.

The total contract price of the general contracting management contract is not determined at one time, but can be calculated after the design of some construction drawings is completed, Determine the contract price of this part of the project.

answer analysis: progress deviation = 90 × 38000-90 × 40000 = – 180000 yuan.

project construction supervision implementation plan B.

In the construction assurance system, the contents belonging to the work assurance system are ()..

[single choice] A.

[multiple choice] A.

[single choice] a.18 B.

Cast In Loop

answer analysis: information management manual has been produced in the field of international engineering management, which is the core guidance document of information management.

C.

implementation plan of project construction supervision correct answer: C.

[single choice] a.0.22 man days , b.0.44 man days , c.0.22 machine shift , d.0.44 machine shift , correct answer: B , answer analysis: if there are two people in the working group, then the labor time quota = 2 / 4.56 = 0.44 man days.

2.

5.

answer analysis: the working steps of the demonstration of the overall progress objectives of the construction project are as follows: investigation and research and data collection; Analyze the project structure; Analyze the structure of the schedule system; Determine the work code of the project; Prepare the schedule of each level (all levels); Coordinate the relationship between the progress plans of all levels and prepare the general progress plan; If the prepared master schedule does not meet the progress objectives of the project, try to adjust it; If the progress target cannot be achieved after multiple adjustments, it shall be reported to the project decision-maker.

monitoring activity guidelines C.

Before writing, the original operation documents shall be cleaned up, picked up to be useful and deleted to be irrelevant.

In the field of international engineering management, the core guidance document of information management is ().

forms referenced in procedure documents D.

operation instructions B.

information management manual; B.

answer analysis: generally, only the general contracting management fee is determined in the general construction contracting management contract, which is usually calculated according to a certain percentage of the project construction and installation cost.

② – ① – ⑤ – ③ – ④ correct answer: D.

In 2022, the examination of construction management for class II constructor is divided into single choice questions and multiple choice questions.

information coding system; D.

– 16 d.16 correct answer: B.

6.

The operation documents of occupational health, safety and environment management system generally include ().

The output of the mechanical shift of two team members is 4.56 (the quota unit is 100m3), so the amount of labor time for digging 100m3 with this machine is ().

D.

in addition to the general contracting management fee, the general contracting management unit shall also calculate the price difference between the general contractor and the subcontractor.

supervision engineer C.

4.

[single choice] a.