Sprint construction management before the second construction examination (18)

meteorological conditions; D.

submit the claim evidence to the supervising engineer; B.

The success of each practice will be reflected in the score incisively and vividly.

C.

B.

submit the claim report; C.

 。.

[multiple choice] a.

submit the notice of claim intention; D.

According to the provisions of the general contract terms in the standard construction bidding document, unless otherwise agreed in the special contract terms, if one () occurs in the performance of the contract, the engineering change shall be carried out in accordance with the provisions.

4.

additional work required to complete the project.

negotiate with the owner on the claim matters; correct answer: C.

major accident; D.

hydrogeological conditions; e.

have the site acceptance certificate of the chief supervision engineer.

particularly major accident; correct answer: C.

E.

natural disasters; B.

According to the unified standard for construction quality acceptance of construction engineering, the conditions that should be met for the quality acceptance of the inspection batch are ().

Get more information: scan the QR code below and leave a private message.

I hope to help you on the road of “textual research”.

C.

[single choice] A.

factors causing fire and explosion; (2) Geotechnical and hydrogeological conditions; (3) Meteorological conditions; (4) Factors causing fire and explosion, etc.

5.

answer analysis: after a claim event occurs during the project implementation, or the contractor finds a claim opportunity, it is necessary to first put forward the claim intention, that is, timely notify the employer or the engineer of the claim intention in writing within the time specified in the contract, It is the first step in the claim procedure to show the other party’s desire, request or statement to reserve the right to claim.

3.

have complete quality inspection records.

Come on together.

Therefore, abce is selected for this question.

You can get the relevant reference materials of the constructor for free.

[multiple choice] A.

the general items have passed the sampling inspection.

In 2022, the construction management examination for grade II constructor is divided into single choice questions and multiple choice questions.

He will accompany you to prepare for the exam step by step.

answer analysis: major accident refers to an accident that causes more than 10 deaths and less than 30 deaths, more than 50 serious injuries and less than 100 serious injuries, or direct economic losses of more than 50 million yuan and less than 100 million yuan.

Correct answer: A, B, C, e answer analysis: the quality acceptance of the inspection lot shall meet the following requirements: the quality of the main control items and general items have passed the sampling inspection; Have complete construction operation basis, quality inspection records, etc.

2.

change the baseline, elevation, position or size of the contract project.

This accident belongs to ().

answer analysis: according to the provisions of the general contract terms in the standard construction bidding document, unless otherwise agreed in the special contract terms, any of the following circumstances in the performance of the contract shall be changed in accordance with the provisions of this article: (1) cancel any work in the contract, but the cancelled work cannot be transferred to the employer or others; (2) Change the quality or other characteristics of any work in the contract; (3) Change the baseline, elevation, position or dimension of the contract works; (4) Change the construction time of any work in the contract or change the approved construction process or sequence; (5) Additional work required to complete the project.

B.

cancel any work in the contract, but the cancelled work cannot be transferred to the employer or others.

E.

After a claim event occurs during the construction of the project, the first thing the contractor should do is ().

ordinary accident; B.

Therefore, this topic chooses ACDE.

have complete construction operation basis.

Correct answers: A, B, C E.

For more information, please continue to pay attention to Wei Lang education.

Bolt Anchor

[single choice] A.

major accident; C.

engineering materials; C.

change the quality or other characteristics of any work in the contract.

1.

The above is the “dry goods” carefully prepared by Weilang education for you.

[multiple choice] A.

During the construction of a construction project, the engineering structure was damaged due to a quality accident, resulting in a direct economic loss of 60million yuan.

Xiaobian has prepared five daily practice questions (with answer analysis) for you every day.

the main control items have passed the sampling inspection.

D.

change the construction time or construction process of any work in the contract.

D.

Among the following construction risk factors of the construction project, those belonging to the environmental risk factors of the project are ().