The construction of crossing over time change and illegal road occupation? Heavy penalty!

Therefore, the law enforcement personnel asked the construction unit and the construction unit on the site respectively, and both sides acknowledged that the road was occupied and excavated without a license.

The law enforcement officers were stunned when they heard this.

The handover intersection is not restored? The law enforcement personnel severely criticized the construction director.

Before the construction, when obtaining the permission for legal construction, we should do a good job in safety enclosure and standardize the construction.

However, in a number of road administration violations recently investigated and dealt with by law enforcement officers, one of the road administration cases is confusing.

At the same time, in order to get a more intuitive understanding of the occupied roads, the law enforcement officers also used UAVs to shoot surveys.

After investigation and evidence collection, the law enforcement officers believe that the land * company is suspected of occupying and excavating roads without approval.

After the construction, we should timely resume the next step of dealing with the aftermath, The law enforcement officers will continue to strengthen the patrol and law enforcement of road administration cases to ensure that the roads are unblocked and the facilities are in good condition to create a safe and smooth traffic environment for citizens.

In accordance with item (6) of Article 42 of the regulations on the administration of urban roads, the law enforcement officers issued a notice of illegal acts to Guangxin company and imposed a fine of 5000 yuan.

It is found that the road occupation for construction has not obtained the road occupation excavation permit from the transportation department, and it is suspected that the road occupation construction is carried out without a permit.

How can it be enclosed and occupied? When surprised, the law enforcement officers quickly checked the map.

Why did this intersection suddenly be handed over to another owner? Law enforcement officers continue to inquire and investigate him.

Our well-informed law enforcement officers were also greatly shocked – three urban roads including Shanshui Road 1, Shanshui Road 2 and Lianshan Road 2 were excavated, occupied and enclosed.

The total area of road occupation excavation was about 13507.2 square meters! ▲ the part marked with the red line is the actual occupied road.

After receiving the notification, the law enforcement personnel and the maintenance department immediately arrived at the site and found that this temporary intersection was simply inaccessible because the road was blocked.

If you have encountered similar illegal occupation construction behaviors when you go out at ordinary times, you should call ☎️ 12328 report to us ~ source | Shenzhen transportation, Shenzhen transportation law enforcement if necessary.

Handling results the law enforcement officers believe that Guang * company is suspected of not occupying and excavating urban roads within the approved time limit.

For a moment, they really thought they had gone to the wrong place.

In accordance with Article 111 of the regulations of the Shenzhen Special Economic Zone on the administration of road traffic safety, the law enforcement officers issued a notice of illegal acts to the company and imposed a fine of 100000 yuan; The relevant person in charge shall be issued a notice of illegal act and fined 5000 yuan.

When the intersection is handed over to the new unit, you will be the shopkeeper? The temporary road junction was not restored to its original state.

They were shocked by the results.

Lifting Eye

Everyone knows that it is necessary to obtain the permit to occupy and excavate the road before the road administration construction.

The law enforcement personnel immediately contacted the construction director of the light * company and inquired about him.

Now the temporary intersection permit has expired and should have been restored to its original state.

They didn’t know what to do.

It is obviously that the permit for temporary intersections has expired, but it has become road occupation and excavation? Law enforcement personnel patiently and carefully investigated and stripped cocoons with the help of UAVs, and finally found out that the intersection involved in the “case in the case” was blocked and the temporary intersection became occupied? A few days ago, the Longgang brigade of the law enforcement detachment received a notification that the temporary intersection applied by the light * company was suspected of overdue construction.

However, the director showed an “irrelevant” attitude.

According to Guang * company, the law enforcement officers immediately inquired and investigated the other party in the case, and entered the construction enclosure for investigation.

After checking that the geographical location was correct, the overdue intersection was within the closed enclosure.

If the occupation exceeds the time limit or refuses to restore, it is suspected of violating Article 36 of the regulations on the administration of urban roads: occupying and excavating urban roads within the approved time limit.

Road administration construction needs everyone’s supervision.

The law enforcement officers were very confused.

Through this case, the law enforcement officers here remind everyone that ▼ no matter the road occupation excavation construction or the temporary opening of the intersection, we should abide by the “three elements” of road administration construction.

The temporary intersection applied for by the light * company is for vehicles and pedestrians.

❗ Dangdang Dang ❗ All kinds of road administration construction projects in Shenzhen have been launched one after another.